![Panasonic ZEQUO 4600RE Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/panasonic/zequo-4600re/zequo-4600re_installation-manual_4226697014.webp)
Port LED (SFP+ port 25-28)
: Shuts off due to loop detection and shutoff functions/storm controls/
BPDU guard
: Transmitting and receiving just the administration packets
Green Light
: Link is established at 1000 Mbps or 10 Gbps.
Green Blink
: Transmitting and receiving data at 1000 Mbps or 10 Gbps.
Orange Light
Orange Blink
Off
: No devices are connected.
Port LED (STACK port 29-30)
: Shuts off due to loop detection and shutoff functions/storm controls/
BPDU guard
: Transmitting and receiving just the administration packets
Green Light
: Link is established at 40 Gbps.
Green Blink
: Transmitting and receiving data at 40 Gbps.
Orange Light
Orange Blink
Off
: No devices are connected.
14
Part Names and Functions
2