
8
Please connect the output cable (electrode holder) to the end of ORDI. STICK (+), when welding
with the ordinary electrode just as Fig.7.1a.
Please connect the output cable (electrode holder) to the end of CEL. STICK (+), when welding
with the cellulose-coated electrode just as Fig.7.1b.
The remote controller is optional with its order is TSM93067. When using remote
controller ,please switch CONTROL in the operational panel to REMOTE, then welding current
adjustor in the operation
al panel won’t work. Please adjust the welding current knob in the remote
controller for getting welding current or presetting current.
Make sure that connect the power source shell and base metal to the grounding firmly.
8. Operation
9. Maintenance and Inspection
To fully act the performance of this machine and continue safely work every day, it is important to carry out daily
inspection and periodic inspection.
When carrying out maintenance/inspection, be sure to turn off the switch box and confirm safety. Except for you
need to inspect during power-on. Otherwise, it may lead to a serious accident affecting safety of the human body,
such as an electric shock, burn, etc.
* Detach the top board.
1. Remove the bolts on the side boards and detach the side boards.
2. Remove 2 bolts and 2 eyebolts on the top board and draw out the top by uplifting its foreside.
* Daily Inspection
Please deal with these troubles in time or contact your dealer for help at detecting some abnormity during the
inspection.
1.
Is there any extraordinary vibration or noise or smell?
2.
Is there any hot evidence in the connection between the cables?
3.
Is the fan work smoothly after power switch on?
4.
Does the power switch work correctly?
5.
Are the connection and insulation of the cables correct?
6.
Are there any faults in all cables?
* Periodic Inspection Items about every 3 or 6 months
Turn on the switch of the switch box
Turn on the power switch in the operational panel
Start welding
End welding
Turn off the switch of the switch box
Turn off the power switch in the operational panel
* Power display lamp will light.
* The cooling fan will work.
* There will be output voltage between
the output ends.
(The no-load voltage is 71V with the
Prevent Electric Shock OFF), whereas
about 13V with it ON.)
* Please weld according to normal
operational procedure.
* Adjust the welding current by Weld Cur.
knob in the operational panel.
* Adjust the arc starting current by
ARC.START Cur. knob in the operational
panel.
* Adjust the arc force current by
ARC.FORCE Cur. knob in the operational
panel.
Содержание YD-400AT
Страница 2: ......
Страница 5: ......
Страница 16: ...11 12 Circuit Diagram TSMPA205 ...
Страница 20: ......