24
Installation
3
Install the receiver in the rack
Use rack-installation screws (x4) to securely fix the receiver.
Rack-installation torque: 2.0 N•m to 2.4 N•m {20.5 kgf•cm to 24.5 kgf•cm}
Rack-installation screws
x4 (locally procured)
memo
Important
Make sure that the temperature inside the rack does not 45 °C
(113 °F).
Do not place the receiver near devices which diffuse large amounts of
heat (eg: power amplifiers).
If it is absolutely necessary to do so, leave at least 1 U (44 mm (1-3/4
inches)) of free space between the receiver and the heat-diffusing
device.
When installing heat-sensitive devices in the same rack as the receiver,
place them lower than the receiver itself.
Install the rack at well-ventilated location. Ventilate the rack so that
accumulated heat does not bring the internal temperature over +45 °C
(113 °F).