
7.1. Disassembly Flow Chart
This flow chart indicates the disassembly steps the cabinet
parts, P.C.B. and Mecha. Unit in order to access to be serviced.
When reinstalling, perform the steps in the reverse order.
7.2. Disassembly Procedures
Flow-Chart for Disassembly Procedure
No
.
Item / Parts
Fig.
Removal
(Screw,Connector,Flex. & Other)
1
Rear Case Unit
Fig.D1 2-Screws (A)
Rear Case Unit
2
Body Case
Fig.D2 4-Screws (B)
Body Case
3
Sub P.C.B. and
Main P.C.B.
Fig.D3 2-Connectors B2, B3
Sub P.C.B.
3-Screws (C)
Main P.C.B.
Fig. D1
Fig. D2
Fig. D3
7 Disassembly and Assembly Instructions
11
VW-BN1PP / VW-BN1E / VW-BN1GK /
Содержание VW-BN1PP
Страница 5: ...2 2 Precautiopn of Laser Diode 5 VW BN1PP VW BN1E VW BN1GK ...
Страница 8: ...4 Specifications 8 VW BN1PP VW BN1E VW BN1GK ...
Страница 9: ...5 Location of Controls and Components 9 VW BN1PP VW BN1E VW BN1GK ...
Страница 10: ...6 Service Fixture Tools 6 1 Service Tools and Equipment 10 VW BN1PP VW BN1E VW BN1GK ...
Страница 14: ...VW BN1PP VW BN1E VW BN1GK 14 ...
Страница 20: ...VW BN1PP VW BN1E VW BN1GK 20 ...
Страница 22: ...13 Parts and Exploded Views 13 1 Exploded Views 13 1 1 Frame Casing Section 22 VW BN1PP VW BN1E VW BN1GK ...
Страница 23: ...13 1 2 Packing Accessories Section 23 VW BN1PP VW BN1E VW BN1GK ...