12 White Balance Adjustment
12.1. White balance adjustment
Name of measuring instrument
Connection
Remarks
·
W/B pattern
·
Color analyzer
(Minolta CA-100 or equivalent)
Component input
Panel surface
Procedure
Remarks
·
Ensure aging is adequate.
·
Make sure the front panel to be used on the final set is fitted.
·
Make sure a color signal is not being shown before adjustment.
·
Put the color analyzer where there is little color variation.
1.
Output a white balance pattern.
2.
Check that the color temperature is “Cool”.
3.
Set to serviceman mode, WB-ADJ.
4. Set “R-CUT” “G-CUT” “B-CUT” the values written in table 1.
5.
Attach the sensor of color analyzer to he center of highlight window.
6.
Fix G drive at C0h and adjust “B-DRV” and “R-DRV” so x, y value of color analyzer
become the “Color temperature High” in table 2.
7.
Increase RGB together so the maximum drive value in RGB becomes FCh. That is,
set “ALL DRIVE” to FCh.
8. Set color temperature to “Normal”.
9.
Set “R-CUT” “G-CUT” “B-CUT” the values written in table 1.
10. Attach the sensor of color analyzer to the center of highlight window.
11. Fix G drive at C0h and adjust “B-DRV” and “R-DRV” so x, y value of color analyzer
become the “Color temperature Mid” in table 2.
12. Increase RGB together so the maximum drive value in RGB becomes FCh. That is,
set “ALL DRIVE” to FCh.
13. Set color temperature to “Warm”.
14. Set “R-CUT” “G-CUT” “B-CUT” the values written in table 1.
15. Attach the sensor of color analyzer to the center of highlight window.
16. Fix G drive at C0h and adjust “B-DRV” and “R-DRV” so x, y value of color analyzer
become the “Color temperature Low” in table 2.
17. Increase RGB together so the maximum drive value in RGB becomes FCh. That is,
set “ALL DRIVE” to FCh.
18. Set color temperature to “Cool”.
[ adjustment of “Normal” “Warm” by data shift from “Cool” adjust. ]
For “Normal” “Warm” adjustment, set values that the adjusted value of “Cool”
plus the figures wrote below.
19. Copy values adjusted by HD pattern to the NTSC data area of EEPROM.
37
TH-50PZ77U
Содержание Viera TH-50PZ77U
Страница 4: ...1 Applicable signals 4 TH 50PZ77U ...
Страница 19: ...8 Location of Lead Wiring 8 1 Lead of Wiring 1 19 TH 50PZ77U ...
Страница 20: ...8 2 Lead of Wiring 2 20 TH 50PZ77U ...
Страница 21: ...8 3 Lead of Wiring 3 21 TH 50PZ77U ...
Страница 22: ...8 4 Lead of Wiring 4 22 TH 50PZ77U ...
Страница 23: ...8 5 Lead of Wiring 5 23 TH 50PZ77U ...
Страница 24: ...8 6 Lead of Wiring 6 24 TH 50PZ77U ...
Страница 25: ...8 7 Lead of Wiring 7 25 TH 50PZ77U ...
Страница 29: ...9 4 No Picture 29 TH 50PZ77U ...
Страница 36: ...11 4 Adjustment Volume Location 11 5 Test Point Location 36 TH 50PZ77U ...
Страница 38: ...38 TH 50PZ77U ...
Страница 40: ...40 TH 50PZ77U ...
Страница 68: ...TH 50PZ77U 68 ...
Страница 69: ...15 1 Schematic Diagram Note 15 Schematic and Block Diagram TH 50PZ77U 69 ...
Страница 135: ...16 Exploded Views Replacement Parts List 16 1 Exploded Views 135 TH 50PZ77U ...
Страница 136: ...16 2 Packing Exploded Views Accessories 136 TH 50PZ77U ...
Страница 137: ...16 3 Packing Explode Views Stand 137 TH 50PZ77U ...
Страница 138: ...16 4 Replacement Parts List Notes 138 TH 50PZ77U ...