2 Safety Precautions
2.1. General Guidelines
1. When conducting repairs and servicing, do not attempt to modify the equipment, its parts or its materials.
2. When wiring units (with cables, flexible cables or lead wires) are supplied as repair parts and only one wire or some of the wires
have been broken or disconnected, do not attempt to repair or re-wire the units. Replace the entire wiring unit instead.
3. When conducting repairs and servicing, do not twist the Faston connectors but plug them straight in or unplug them straight out.
4. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or
damaged by the short circuit.
5. After servicing, see to it that all the protective devices such as insulation barriers, insulation papers shields are properly
installed.
6. After servicing, make the following leakage current checks to prevent the customer from being exposed to shock hazards.
2.2. Touch-Current Check
1. Plug the AC cord directly into the AC outlet. Do not use an isolation transformer for this check.
2. Connect a measuring network for touch currents between each exposed metallic part on the set and a good earth ground such
as a water pipe, as shown in Figure 1.
3. Use Leakage Current Tester (Simpson 228 or equivalent) to measure the potential across the measuring network.
4. Check each exposed metallic part, and measure the voltage at each point.
5. Reserve the AC plug in the AC outlet and repeat each of the above measure.
6. The potential at any point (TOUGH CURRENT) expressed as voltage U
1
and U
2
, does not exceed the following values:
For a. c.: U
1
= 35 V (peak) and U
2
= 0.35 V (peak);
For d. c.: U
1
= 1.0 V,
Note:
The limit value of U
2
= 0.35 V (peak) for a. c. and U
1
= 1.0 V for d. c. correspond to the values 0.7 mA (peak) a. c. and 2.0
mA d. c.
The limit value U
1
= 35 V (peak) for a. c. correspond to the value 70 mA (peak) a. c. for frequencies greater than 100 kHz.
7. In case a measurement is out of the limits specified, there is a possibility of a shock hazard, and the equipment should be
repaired and rechecked before it is returned to the customer.
Figure 1
6
TH-50PV700AZ / TH-50PV700H / TH-50PV700M / TH-50PV700MR
Содержание Viera TH-50PV700AZ
Страница 5: ...1 Applicable signals 5 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 20: ...8 Location of Lead Wiring 8 1 Lead of Wiring 1 20 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 21: ...8 2 Lead of Wiring 2 21 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 22: ...8 3 Lead of Wiring 3 22 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 26: ...9 4 No Picture 26 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 33: ...11 4 Adjustment Volume Location 11 5 Test Point Location 33 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 38: ...38 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 64: ...TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR 64 ...
Страница 120: ...TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR 120 ...
Страница 121: ...16 Exploded Views Replacement Parts List 16 1 Exploded Views 121 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 122: ...16 2 Packing Exploded Views 1 122 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 123: ...16 3 Packing Exploded Views 2 123 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 124: ...16 4 Packing Exploded Views 3 124 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...
Страница 125: ...16 5 Replacement Parts List Notes 125 TH 50PV700AZ TH 50PV700H TH 50PV700M TH 50PV700MR ...