21
6. Remove the G-Board and the GH-board.
7.14. Remove the SU-Board
1. Remove the flexible cables (SU1, SU2, SU3 and SU4)
connected to the SU-Board.
2. Remove the flexible cable (SU11-SD11) and the bridge
connector (SC41-SU41).
3. Remove the molding prop (
×
1 ).
4. Remove the screws (
×
4
) and remove the SU-Board.
7.15. Remove the SD-Board
1. Remove the flexible cables (SD1, SD2, SD3 and SD4)
connected to the SD-Board.
2. Remove the flexible cable (SU11-SD11) and the bridge
connectors (SC42-SD42 and SC46-SD46).
3. Remove the molding prop (
×
1 ).
4. Remove the screws (
×
4
) and remove the SD-Board.
7.16. Remove the SC-Board
1. Remove the SU-Board and SD-Board. (See section 7.14.
and 7.15.)
2. Unlock the cable clampers to free the cable.
3. Disconnect the connector (SC2).
4. Disconnect the flexible cable (SC20).
5. Remove the screws (
×
8
) and remove the SC-Board.
Содержание VIERA TH-42PZ85U
Страница 15: ...15 6 4 No Picture ...
Страница 28: ...28 8 1 4 Adjustment Volume Location 8 1 5 Test Point Location ...
Страница 30: ...30 ...
Страница 38: ...38 10 3 Wiring 2 ...
Страница 39: ...39 11 Schematic Diagram 11 1 Schematic Diagram Note ...
Страница 100: ...100 ...
Страница 102: ...102 13 1 2 Fan part location ...
Страница 103: ...103 13 1 3 Accessories ...
Страница 104: ...104 13 1 4 Mechanical Replacement Parts List ...
Страница 107: ...107 13 2 Electrical Replacement Parts List 13 2 1 Replacement Parts List Notes ...