
Design of 3WAY VRF SYSTEM
2
- 29
1
2
3
4
5
6
7
8
9
19
4-2. Shield for Horizontal Exhaust Discharge
It is necessary to install an air-discharge chamber (field
supply) to direct exhaust from the fan horizontally if it is difficult
to provide a minimum space of 7 ft. (2m) between the air-
discharge outlet and a nearby obstacle.
CAUTION
In regions with heavy snowfall,
the outdoor unit should be
provided with a solid, raised
platform and snow-proof
ducting (field supply).
Fallen snow
DO
AVOID
Without snow-
proof ducting
(Without platform)
With snow-
proof ducting
(High platform)
4-3. Installing the Outdoor Unit in Heavy Snow
Areas
In locations where wind-blown snow can be a problem,
snow-proof ducting (field supply) should be fitted to the unit
and direct exposure to the wind should be avoided as much as
possible.
The following problems may occur if proper countermeasures
are not taken:
The fan in the outdoor unit may stop running, causing the
unit to be damaged.
There may be no air flow.
The tubing may freeze and burst.
The condenser pressure may drop because of strong wind,
and the indoor unit may freeze.
4-4. Precautions When Installing in Heavy Snow
Areas
a) The platform should be higher than the maximum snow
depth.
b) The 2 anchoring feet of the outdoor unit should be used for
the platform, and the platform should be installed beneath
the air-intake side of the outdoor unit.
c) The platform foundation must be solid and the unit must be
secured with anchor bolts.
d) When installing on a roof subject to strong wind,
countermeasures must be taken to prevent the unit from
being overturned.
01_280157_Eng.indd 19
2015-11-11 9:12:22
4. SELECTING THE INSTALLATION SITE
TD831183-00_北米向け3WAY.indb 29
15/12/17 16:05:13
Содержание U-120MF2U9
Страница 8: ... MEMO ...
Страница 16: ... MEMO 1 8 ...
Страница 82: ... MEMO 2 66 ...
Страница 84: ... MEMO 3 2 ...
Страница 100: ... MEMO 4 16 ...
Страница 101: ...5 1 1 2 3 4 5 6 7 8 9 Test Run Contents 5 TEST RUN Refer to the SERVICE MANUAL TEST RUN SERVICE MANUAL SM830246 ...
Страница 102: ...1 2 3 4 5 6 7 8 9 MEMO 5 2 ...
Страница 105: ...Electrical Data 6 3 1 Outdoor Unit 1 2 3 4 5 6 7 8 9 Electrical Data 6 2 1 Outdoor Unit Schematic Diagram U 72MF2U9 ...
Страница 107: ...Electrical Data 6 5 1 Outdoor Unit 1 2 3 4 5 6 7 8 9 Electrical Data 6 2 1 Outdoor Unit Schematic Diagram U 96MF2U9 ...
Страница 109: ...Electrical Data 6 7 1 Outdoor Unit 1 2 3 4 5 6 7 8 9 Electrical Data 6 2 1 Outdoor Unit Schematic Diagram U 120MF2U9 ...
Страница 111: ...Electrical Data 6 9 1 Outdoor Unit 1 2 3 4 5 6 7 8 9 Electrical Data 6 2 1 Outdoor Unit Schematic Diagram U 144MF2U9 ...
Страница 112: ... MEMO 6 10 ...
Страница 181: ...201512 ...