23
7.20. Remove the S-Board
1. Remove the Cabinet assy. (See section 7.19.)
2. Disconnect the connector (S2).
3. Remove the screws (
×
2
) and remove the S-Board
metal frame.
4. Remove the screws (
×
2
) and remove the S-Board.
7.21. Remove the K-Board
1. Remove the Cabinet assy. (See section 7.19.)
2. Remove the S-Board. (See section 7.20.)
3. Remove the screws (
×
2 ).
4. Disconnect the connector (K1) and Remove the K-Board.
7.22. Remove the plasma panel (fin-
ished)
1. Place the new plasma panel (finished) on the flat surface
of the table (covered by a soft cloth), with the plasma
panel surface facing downward.
2. Attach the C1-Board and the C2-Board, connect the flexi-
ble cables (
×
15) from the plasma panel to the C1-Board
and the C2-Board, and fit the flexible cable holders.
3. Attach the Hooks (left, right) and fit the stand brackets (L,
R) to the new plasma panel.
4. Place the plasma panel section on the servicing stand.
5. Attach the cabinet assy and each P.C.Board and so on, to
the new plasma panel.
*When fitting the cabinet assy, be careful not to allow
any debris, dust or handling residue to remain
between the front glass and plasma panel.
Содержание TH-C42FD18
Страница 15: ...15 6 4 No Picture ...
Страница 26: ...26 8 1 4 Adjustment Volume Location 8 1 5 Test Point Location ...
Страница 28: ...28 ...
Страница 36: ...36 10 3 Wiring 2 ...
Страница 37: ...37 10 4 Wiring 3 ...
Страница 38: ...38 10 5 Wiring 4 ...
Страница 39: ...39 10 6 Wiring 5 ...
Страница 40: ...40 ...
Страница 41: ...41 11 Schematic Diagram 11 1 Schematic Diagram Note ...
Страница 100: ...100 ...
Страница 102: ...102 13 1 2 Fan part location ...
Страница 103: ...103 13 1 3 Accessories ...
Страница 104: ...104 13 1 4 Mechanical Replacement Parts List ...
Страница 107: ...107 13 2 Electrical Replacement Parts List 13 2 1 Replacement Parts List Notes ...