z
If the wires used are long, recalculate the load by adding the weights of
the wires.
z
Check with the builder (e.g. the construction JV) as to the strength of
the section where the PDP is hung (e.g. steel frames, ceiling slab) to
confirm that the section has adequate strength before starting the work.
If the strength is not adequate, it is fully expected that the section
cannot withstand the load only with external anchors.
z
Ensure that the wires have been processed with specified parts and
tools and maintain the specified strength.
z
The breaking strength of stainless steel wires varies depending on the
manufacturer. Therefore, when using a stainless steel wire, check with
the specifications of the wire to confirm that it has the required strength.
Содержание TH-85PF12U
Страница 1: ......
Страница 4: ... Subject to change without notice due to improvements of the product specifications and or design ...
Страница 5: ... Subject to change without notice due to improvements of the product specifications and or design ...
Страница 13: ...100 D 150 100 100 100 E C B A Unit mm A D C E B ...
Страница 14: ...E D C B A 150 100 100 100 100 Unit mm A B C D E ...
Страница 18: ...Base Plate 30 16 Unit mm ...
Страница 19: ...z Stand specifications Model No TY CE85PS12 Weight Approx 32 0 kg ...
Страница 20: ...0 degrees z Stand specifications Model No TY CE85PS12 Weight Approx 32 0 kg 5 degrees 10 degrees 15 degrees ...
Страница 22: ... Drawings and Earthquake Resistance Data Reference ...