Use the self-check function to test the unit.
9 Self-check Function
1. Checking the IIC bus lines
2. Power LED Blinking timing
9.1. Check of the IIC bus lines
9.1.1. How to access
Self-check indication only:
Produce TV reception screen, and while pressing [VOLUME ( - )] button on the main unit, press [OK] button on the remote control
for more than 3 seconds.
Self-check indication and forced to factory shipment setting:
Produce TV reception screen, and while pressing [VOLUME ( - )] button on the main unit, press [MENU] button on the remote
control for more than 3 seconds.
9.1.2. Screen display
9.1.3. Check Point
Confirm the following parts if NG was displayed.
9.1.4. Exit
Disconnect the AC cord from wall outlet.
21
TH-50PV70L
Содержание TH-50PV70L
Страница 5: ...1 Applicable signals 5 TH 50PV70L ...
Страница 19: ...8 Location of Lead Wiring 8 1 Lead of Wiring 1 19 TH 50PV70L ...
Страница 20: ...8 2 Lead of Wiring 2 8 3 Lead of Wiring 3 20 TH 50PV70L ...
Страница 24: ...9 4 No Picture 24 TH 50PV70L ...
Страница 31: ...11 4 Adjustment Volume Location 11 5 Test Point Location 31 TH 50PV70L ...
Страница 36: ...36 TH 50PV70L ...
Страница 61: ...15 Schematic and Block Diagram 15 1 Schematic Diagram Note TH 50PV70L 61 ...
Страница 115: ...16 Exploded Views Replacement Parts List 16 1 Exploded Views 115 TH 50PV70L ...
Страница 116: ...16 2 Packing Exploded Views 1 116 TH 50PV70L ...
Страница 117: ...16 3 Packing Exploded Views 2 117 TH 50PV70L ...
Страница 118: ...16 4 Packing Exploded Views 3 118 TH 50PV70L ...
Страница 119: ...16 5 Accessory 119 TH 50PV70L ...
Страница 120: ...16 6 Replacement Parts List Notes 120 TH 50PV70L ...