(Confirmation point)
3-3-8. Procedure in detail for replacing the escutcheon
<Notice for replacing the escutcheon>
Confirmation of flexible cable from panel
When replace the escutcheon, please be careful not to damage the all of flexible
cable from panel (SC side and SS side) by inside metal plate of escutcheon.
Flexible cable
Metal plate
Move the escutcheon
Move the jacks
Содержание TH-103PF9CK
Страница 4: ...Preparation for exchange the panel Preparation for exchange the panel Step 1 Step 1 Step 1 ...
Страница 10: ...Move the panel to the stand Move the panel to the stand Step 2 Step 2 Step 2 ...
Страница 21: ...Replace the escutcheon Replace the escutcheon Step 3 Step 3 ...
Страница 34: ...Replace the PCB Replace the PCB Step 4 Step 4 ...
Страница 37: ...Adjustment of the voltage and waveform Adjustment of the voltage and waveform Step 5 Step 5 Step 5 ...
Страница 43: ...Note ...
Страница 44: ......