- 24 -
Quick adjustment after P.C.B. exchange
When a P.C.B. is changed following P.C.B. should be re-adjusted.
Changed
P.C.B.
Item
Volume
Test point
Level
P board
V
DA
R528
TPDA1(C1)
75V ± 0.5V
V
SUS
R639
TPVSUS
V
SUS
± 1V
V
E
R494(P1)
TPVE
V
E
± 1V
DS board
DS contrast
IIC mode
TP216
0.7 Vp-p
SC board
Vset
R6587
TPVSET
VSET ± 0.5V
Vscn
R6595
TPVSCN
80V ± 0.5V
SS board
Erase pulse
R6754
TPSS1
Waveform
D board
Re-confirmation of all alignment setting
!"
Содержание TC-42PD1F
Страница 4: ... 4 Operation Instruction ...
Страница 5: ... 5 ...
Страница 6: ... 6 ...
Страница 7: ... 7 ...
Страница 31: ...MEMO 31 ...
Страница 32: ...Printed in Japan 99060250 H 0615 ...