is evident.
4. After servicing, be sure to restore the lead dress, insulation
barriers, insulation papers, shields, etc.
5. Before returning the serviced equipment to the customer, be sure
to make the following insulation resistance test to prevent the
customer from being exposed to a shock hazard.
2.2. Insulation resistance test
1. Unplug the power cord and short the prongs of the plug with a
jumper wire.
2. Turn on the power switch.
3. Measure the resistance value with an ohmmeter between the
jumpered AC plug and each exposed metal cabinet part, such as
screw heads, connectors, control shafts, handle brackets, etc.
Measurements should range from 4 M Ohm to infinity for
allexposed parts.
3. Handling Precautions For Traverse Deck
The laser diode in the traverse deck (optical pickup) may break down due to potential difference
caused by static electricity of clothes or human body.
So, be careful of electrostatic breakdown during repair of the traverse deck (optical pickup).
- Handling of traverse deck (optical pickup)
1. Do not subject the traverse deck (optical pickup) to static
electricity as it is extremely sensitive to electrical shock.
2. The short land between the No.4(LD) and No.5(GND) pins on the
flexible board (FFC) is shorted with a solder build-up to prevent
damage to the laser diode.To connect to the PC board, be sure to
open by removing the solder build-up, and finishthe work quickly.
3. Take care not to apply excessive stress to the flexible board (FFC).
4. Do not turn the variable resistor (laser power adjustment). It has
4
Содержание SY-PA100
Страница 24: ...24...
Страница 25: ...12 MEASURING CONDITION 12 1 Measuring condition of MAIN P C B Check Point 1 9 25...
Страница 45: ...45...
Страница 46: ...19 PACKAGING 46...
Страница 47: ...Printed in Japan S010700000 HM AM 47...