background image

9

SR-G06G/SR-G10SG/SR-G18SG

1. Bubbling test

Input the pan in the main body, and lightly rotate the pan clockwise and counter clockwise 

to set the pan on the heating plate properly.

1. Fill water until the center area of the pan bottom is dipped, and close the lid. Then turn 

on the boiling switch.

2. When it beings boiling to produce steam, remove the lid and immediately check the 

bubbling condition on the pan bottom.

3. Bubbling condition is shown in figure 3.

A. Bubbles generate through out the circumference of the pan bottom ............... Proper

B. Bubbles does not generate on more than one quater part of the pan bottom 

circuference .................................................................................................. Improper

If it is improper, it may result from the insfficient contact between the pan bottom and 

the sheathed heater. Check the pan bottom and the sheathed heater for foreign material 

remained. Clean up the foreign materials or replace the parts.

2. Evaporation test

1. After satisfactory bubbling is confirmed, remove the lid and put a weight on the cooker.

2. Cover the entire pan bottom with 2 or 3 pieces of tissue paper (or gauze), and turn on 

the switch subsequently.

3. The cooker is considered acceptable if the timing when steam generation comes to 

a stop after water of the pan bottom has evaporated, is within 1 minute before and 

after the cooking switch is turned off. If these requirements are not satisfied, check the 

center  thermostat as well as the contacted condition between the pan bottom and the 

cooking heater, and then repair or replace the parts.

5 cm.

.

m

c

 

0

4

Pan (viewed from above) 

Pan flange 

section 

Holes of 

tissue paper 

Tissue paper 

Water Level

Sheathed heater

Center thermostat

Figure 2

Figure 3

Water Level

A

B

4. TESTING PROCEDURE

Содержание SR-G06G

Страница 1: ...18SG Detail Power Source 1 Phase AC 120V 60 Hz Power consumption Cooking 300W 450W 650W Warming 43 7W 45W Cooking capacity 0 18 0 6 L 0 18 1 0 L 0 54 1 8 L Center thermostat working temperature 134 C 6 C Keep warm temperature More than or equal to 80 C After 1 Hr keep warm Thermal fuse specification 110 C 250V 10A Dimension mm Width x Depth x Height 254 x 201 x 209 282 x 229 x 238 325 x 283 x 255 W...

Страница 2: ...y anyone else could result in serious injury or death There are special components used in this equipment which are important for safety These parts are marked by in the Schematic Diagrams Circuit Board Diagrams Exploded Views and Replacement Parts List It is essential that these critical parts should be replaced with manufacturer s specified parts to prevent shock fire or other hazards Do not modif...

Страница 3: ...ed tube N Insulation Color Blue In case of wire broken make sure that earth wire is the last wire to be disconnected Red tube L Insulation Color Brown Green tube E Insulation Color Green Lamp lead wire A Red Lamp lead wire D Yellow Power Cord Wire Red Lamp lead wire D Yellow Lamp lead wire C White Lamp lead wire C White Lead wire of mica heater White Lamp lead wire B Blue shall not pass on top sid...

Страница 4: ... Insulation Color Blue In case of wire broken make sure that earth wire is the last wire to be disconnected Red tube L Insulation Color Brown Lamp lead wire C Red Lamp lead wire A Yellow Power Cord Wire Red Lamp lead wire B Blue Lamp lead wire B White SCHEMATIC DIAGRAM SR G10SG SR G18SG WIRING DIAGRAM SR G10SG SR G18SG 1 SCHEMATIC DIAGRAM WIRING DIAGRAM ...

Страница 5: ...t with the metal c When the rice is cooked and the proper temperature has been reached 134 C 6 C the metal and magnet will pop apart as described in the center thermostat operation above d The rod will push the switch lever and cause the auxiliary lever to depress the micro switch button This puts the micro switch in the warming position 2 When the pan is not in place within the rice cooker the ce...

Страница 6: ...ion of current Cause Pan collar or deformed Foreign matter adhering Body dented or deformed Pan bottom dented or deformed Heater surface deformed or corroded Remedy Remove foreign matter by of screw driver etc and then polish with 320 water paper while wetting it with water Repair or replace body Replace pan Replace cooking heater Cause Chopstick wooden piece etc inserted onto cooking button conti...

Страница 7: ...ed heater Thermal fuse blown Forced application of current Yes Explain correct usage Rice burns Brown color Center thermostat defective Check with evaporation test Yes Replace center thermostat Switch lever has been properly adjusted No Adjust Lever Usage correct Rice is not rinced well enough Using with low rated voltage Too much water input for cooking Yes Explain correct usage When receiving th...

Страница 8: ...as been properly adjusted No Adjust switch lever Usage correct Too small or large in rice quantity Too small or large in water quantity Switched off once by hand in cooking process Switched off by shocks given in cooking process Rice not untied Explain correct usage Keep warm function Warming fails Warm lamp not shown Micro switch change contact to NO Warm mode after cooking is done No Adjust swit...

Страница 9: ...eater Check the pan bottom and the sheathed heater for foreign material remained Clean up the foreign materials or replace the parts 2 Evaporation test 1 After satisfactory bubbling is confirmed remove the lid and put a weight on the cooker 2 Cover the entire pan bottom with 2 or 3 pieces of tissue paper or gauze and turn on the switch subsequently 3 The cooker is considered acceptable if the timin...

Страница 10: ...djust this relationship as shown below When the boiling switch is turned on When the boiling switch is turned off Checking The auxiliary lever presses the push button The WARM lamp comes on The auxiliary lever does not press the push button The COOK lamp comes on Adjusting To gain the above relationship adjust the auxiliary lever by bending it with long nose pliers 4 TESTING PROCEDURE ...

Страница 11: ...11 SR G06G SR G10SG SR G18SG A 2 2 2 32 1 2 23 24 4 1 5 6 7 9 21 22 8 19 18 13 15 10 14 12 11 16 17 20 C B E H I D G F 5 EXPLODED VIEW ...

Страница 12: ... Y 1 7 AQL20T270 0U CAST HEATER ASS Y 1 1 8 AQE30T271 WU HANDLE 2 2 White 8 AQE30T271 EG HANDLE 2 2 Silver 8 AQE30T270 WU HANDLE 2 White 8 AQE30T270 EG HANDLE 2 Silver 9 AQE13T272 WU BODY COMPLETE 1 White 9 AQE13T272 U2 BODY COMPLETE 1 Silver 9 AQE13T271 WU BODY COMPLETE 1 White 9 AQE13T271 U2 BODY COMPLETE 1 Silver 9 AQE13T270 WU BODY COMPLETE 1 White 9 AQE13T270 U2 BODY COMPLETE 1 Silver 10 AQN0...

Страница 13: ...ATER ASS Y 1 1 18 AQL92T270 WIRING TERMINAL ASS Y 1 1 19 AQH20T270 WU BOTTOM PLATE ASS Y 1 White 19 AQH20T270 EG BOTTOM PLATE ASS Y 1 Silver 19 AQH20T271 WU BOTTOM PLATE ASS Y 1 White 19 AQH20T271 EG BOTTOM PLATE ASS Y 1 Silver 19 AQH20T270 WU BOTTOM PLATE ASS Y 1 White 19 AQH20T270 EG BOTTOM PLATE ASS Y 1 Silver 20 AQY50H280 WU NAME PLATE 1 White 20 AQY50H280 EG NAME PLATE 1 Silver 20 AQY50H279 W...

Страница 14: ...G06G SR G10SG SR G18SG Remark 1 AQY00H2761 OPERATING INSTRUCTION 1 1 1 AQY00H2701 OPERATING INSTRUCTION 1 2 AQZ11T270 UPPER PAD 2 2 AQZ11T271 UPPER PAD 2 2 AQZ11T272 UPPER PAD 2 3 ASR758T140A RUST PROOF PAPER 1 1 1 4 AQZ12T272 LOWER PED A 1 4 AQZ12T271 LOWER PED A 1 4 AQZ12T270 LOWER PED A 1 5 AQZ13T772 LOWER PED B 1 5 AQZ13T271 LOWER PED B 1 5 AQZ13T270 LOWER PED B 1 6 AQZ12T272 WU INNER PACKING ...

Отзывы: