72
Step 20 :
Lay the AC IN P.C.B. on an insulation sheet.
Step 21 :
Check and repair AC IN P.C.B. according to the dia-
gram shown.
10.6. Checking and Repairing SMPS
P.C.B.
• Follow the (Step 1) - (Step 20) of item 10.5.
Step 1 :
Remove 2 screws.
Step 2 :
Flip and lay the SMPS P.C.B. on the insulation sheet.
Содержание SC-HC3P
Страница 11: ...11 5 Location of Controls and Components 5 1 Main Unit Key Button Operations ...
Страница 12: ...12 5 2 Remote Control Key Button Operations ...
Страница 13: ...13 6 Operating Instructions 6 1 Disc and MP3 Information ...
Страница 22: ...22 9 2 Type of Screw 9 3 Main Parts Location Diagram ...