1. When servicing, observe the original lead dress. If a short circuit
is found, replace all parts which have been overheated or
damaged by the short circuit.
2. After servicing, see to it that all the protective devices such as
insulation barriers, insulation papers shields are properly installed.
3. After servicing, make the following leakage current checks to
prevent the customer from being exposed to shock hazards.
1.1.1. LEAKAGE CURRENT COLD CHECK
1. Unplug the AC cord and connect a jumper between the two prongs
on the plug.
2. Measure the resistance value, with an ohmmeter, between the
jumpered AC plug and each exposed metallic cabinet part on the
equipment such as screwheads, connectors, control shafts, etc.
When the exposed metallic part has a return path to the chassis,
the reading should be between 1M and 5.2 . / When the
exposed metal does not have a return path to the chassis, the
reading must be
.
Fig. 1
1.1.2. LEAKAGE CURRENT HOT CHECK (See Figure 1.)
1. Plug the AC cord directly into the AC outlet. Do not use an
isolation transformer for this check.
2. Connect a 1.5k , 10 watts resistor, in parallel with a 0.15 F
capacitors, between each exposed metallic part on the set and a
good earth ground such as a water pipe, as shown in Figure 1.
3. Use an AC voltmeter, with 1000 ohms/volt or more sensitivity, to
measure the potential across the resistor.
4. Check each exposed metallic part, and measure the voltage at
3
Содержание SB-WA340EBS1
Страница 1: ...ORDER NO MD0310441C2 Active Subwoofer System SB WA340EBS1 Colour S1 Silver Type 1 ...
Страница 14: ...13 1 2 Cabinet Parts List 14 ...
Страница 17: ...17 ...
Страница 19: ...19 ...
Страница 24: ...FLE0310 D A S E N 24 ...