6.7. Disassembly and checking of
Level control P.C.B and LED
P.C.B
Follow (step 1) in item 6.3.
Step 1:
Detach the connectors CN502B and CN101B.
Step 2:
Remove 6 screws.
Step 3:
Remove the control panel unit from the front net frame
as arrow shown.
Step 4:
Remove 2 screws.
Step 5:
Remove the barrier as arrow shown.
Step 6:
Remove 2 screws.
14
SB-WA1000E
Содержание SB-WA1000E
Страница 7: ...4 Accessory AC mains lead 1 pc Monaural connection cable 5 m 1 pc 7 SB WA1000E ...
Страница 23: ...8 Connection of the Speaker wiring 23 SB WA1000E ...
Страница 26: ...SB WA1000E 26 ...
Страница 28: ...28 SB WA1000E ...
Страница 32: ...SB WA1000E 32 ...
Страница 36: ...15 Exploded view 15 1 Cabinet Parts Location 36 SB WA1000E ...
Страница 37: ...37 SB WA1000E ...
Страница 38: ...15 2 Packaging 15 2 1 SB WA1000E S 38 SB WA1000E ...