3. Check the phase.
A. The projecting portion of a dividing lever (2) should be inserted
into a concave portion of a dividing lever (a).
B. Seta loading gear at the position shown by figure 2.
C. The hole A of pitch plate should be positioned at a hole of a
main gear. (Figure 3)
D. The hole B of pitch plate should be positioned at a hole of a
speedup gear. (Figure 4)
E. Set the bottom rib of a tray drive gear to be level. (Figure 5)
4. Push in 5 disk trays simultaneously.
51
Содержание SA-PM17E
Страница 5: ...Remote Control Transmitter 1 pc 4 Caution for AC Mains Lead 5 ...
Страница 13: ...8 Front Panel Controls 13 ...
Страница 14: ...14 ...
Страница 20: ...Steps 11 12 Remove all the screws Step 13 Remove all the screws and pull up the cover as the arrow shown 20 ...
Страница 23: ...23 ...
Страница 25: ...25 ...
Страница 26: ...9 5 Procedure for Replacing Parts on Mechanism PCB Follow Steps 1 to 4 described in Item 9 1 26 ...
Страница 29: ...29 ...
Страница 30: ...30 ...
Страница 31: ...31 ...
Страница 35: ...35 ...
Страница 36: ...36 ...
Страница 37: ...9 11 Replacement of the traverse mechanism Follow Steps 1 to 7 described in Item 9 10 37 ...
Страница 39: ...39 ...
Страница 40: ...40 ...
Страница 41: ...41 ...
Страница 54: ...54 ...
Страница 55: ...9 15 Handling of cassette tape jam Follow Steps 1 to 3 described in Item 9 1 55 ...
Страница 64: ...16 Troubleshooting Flowchart CD Section Circuit 64 ...
Страница 65: ...65 ...
Страница 75: ...19 1 2 Deck Mechanism Parts List 75 ...
Страница 77: ...77 ...
Страница 78: ...78 ...
Страница 79: ...79 ...
Страница 80: ...19 2 2 CD Loading Mechanism Parts List 80 ...
Страница 83: ...83 ...
Страница 84: ...19 3 2 Cabinet CD Loading Machanism Parts List 84 ...
Страница 88: ...88 ...
Страница 92: ... M 92 ...
Страница 94: ...JACKS 94 ...
Страница 104: ...C22 ECA1CAK101XB 100 16V M 104 ...
Страница 113: ... Printed in Singapore M020500001FLE K E J A S N 113 ...