B. Make sure the phase hole of the Main Cam Gear on the bottom side
of Mechanism Unit is in EJECT position.
Fig. D3
C. Install the Mechanism Chassis straight onto the Main C.B.A. so that
the Sensor LED clears the hole in the Mechanism Chassis and that 3
Connectors (P3501, P4001, P6201) are aligned and seated securely.
5.2. MECHANISM SECTION
Refer to the Service Manual for R4-Mechanism Chassis for PV-Model (Order No. MKE0401000C1).
6. SCHEMATIC DIAGRAMS
6.1. SCHEMATIC DIAGRAM & CIRCUIT BOARD LAYOUT NOTES
6.2. MAIN SCHEMATIC DIAGRAMS
6.3. INTERCONNECTION SCHEMATIC DIAGRAM
6.4. VOLTAGE CHART
16
Содержание PV-V4524S
Страница 18: ...9 2 CHASSIS FRAME AND CASING PARTS SECTION 18...
Страница 19: ...9 3 PACKING PARTS AND ACCESSORIES SECTION 19...
Страница 32: ...32...
Страница 34: ...34...
Страница 38: ...38...
Страница 40: ...40...