
34
Correcting/Changing Schedules in "Set Position"
When a schedule is set from a location other than the selected group/keyword/projector, The "Set Position"
indicates the location where the schedule was programmed. If it was set for the group to which the projector
belongs, "
G: Group Name
" is indicated. If it was set for the keyword assigned to the projector, "
K: Keyword
"
is indicated.
To correct/change a schedule indicated in "
Set Position
," close all schedule setting windows, select a group
or keyword indicated in "
Set Position
" in the group/keyword tree view pane, and follow the schedule
correction/change procedure described on the previous page.