6.2.7.1. Reassembly Notes
1. Alignment of Main Rod and T Loading Arm Unit
A. Align the Gear of T Loading Arm Unit with Gear of Main Rod.
Confirm that the Hole on Main Rod is a Through Hole with a hole
on chassis.
Fig. J5-2
6.2.8. Stopper Angle, Capstan Rotor Unit, Oil Seal, Capstan Stator C.B.A., and MR
Head
Fig. J6-1
40
Содержание OmniVision PV-Q1311
Страница 9: ...Fig 1 4 Fig 1 5 9...
Страница 23: ...5 2 IC TRANSISTOR AND CHIP PART INFORMATION 23...
Страница 27: ...Fig D4 Fig D5 27...
Страница 31: ...6 2 2 Inner Parts Location Fig J1 1 31...
Страница 32: ...6 2 3 EJECT Position Confirmation Fig J1 2 32...
Страница 33: ...6 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 33...
Страница 84: ...84...
Страница 88: ...11 2 MECHANISM BOTTOM SECTION 88...
Страница 89: ...11 3 CASSETTE UP COMPARTMENT SECTION 89...
Страница 90: ...11 4 CHASSIS FRAME SECTION 1 90...
Страница 91: ...11 5 CHASSIS FRAME SECTION 2 91...
Страница 93: ...Model PV C2011 PV C2021 PV C2031W VV 2001 PV C2061 93...
Страница 111: ...R4591 ERDS2TJ681T CARBON 1 4W 680 111...
Страница 113: ...R6009 ERJ6GEYJ102V MGF CHIP 1 10W 1K 113...
Страница 135: ...R6032 ERJ6GEYJ102V MGF CHIP 1 10W 1K 135...
Страница 142: ...C3060 ECEA1CKA100 ELECTROLYTIC 16V 10UF 142...