59
9. After all welding processes is done, press nitrogen from compressor and dryer service tubes to check if there any blockage.
10. Blank the service tube on dryer (with welding) and connect the gas charging machine via service tube on compressor for vac-
uuming. (Vacuuming should last at least 45 mins, after vacuuming check the pressure levels for ensuring there is not any
leakage.)
Содержание NR-B32SG1
Страница 2: ...2 1 Safety Precautions ...
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 6: ...6 3 General Introduction 3 1 Flow of Refrigerant ...
Страница 7: ...7 3 2 Flow of Air 3 2 1 Inside the Fridge 3 2 2 Flow of Air Through Air Ducts Front view ...
Страница 12: ...12 5 Location of Controls and Components 5 1 Display and Control Panel ...
Страница 13: ...13 5 2 Components ...
Страница 24: ...24 9 Troubleshooting Guide ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 30: ...30 4 Disconnect all socket connections 5 Remove the main pcb box and take out the main PCB ...
Страница 36: ...36 How to replace fan motor Summary ...
Страница 74: ...74 12 Dimensions ...