sink because it is hot.
Figure 3
Removal of the inverter PCB
Figure 4
Disconnecting the PCB lock connector
9.3. Digital Programmer Circuit (DPC) and membrane key board.
NOTE: Ground any static electric built up on your body before handling the DPC.
1. Disconnect all connectors from the DPC.
2. Remove the four screws holding the escutcheon base and slide
the escutcheon base upward slightly. removal is easier with the
door open.
3. Release the flat cable.
4. Remove the six screws holding the DPC DU assembly
5. Remove the door lever
6. Remove the nine screws holding the DPC AU assembly
To remove escutcheon pad
1. Remove the escutcheon bracket from the escutcheon base by
freeing the 4 catch hooks on the escutcheon base.
Содержание NN-A883WB
Страница 4: ...3 Control Panel 4 Operation And Digital Programmer Circuit Test Procdure ...
Страница 5: ......
Страница 6: ......
Страница 7: ...5 Schematic Diagram ...
Страница 27: ...Removing the oven back plate Figure 15 Removing the base plate Figure 16 ...
Страница 34: ...Fuses are not blown Fuses are not blown ...
Страница 35: ...Other problems Inverter circuit troubleshooting ...
Страница 36: ...Alternative method for toubleshooting the inverter circuit 13 Digital Programmer Troubleshooting Guide ...
Страница 37: ...How to check semiconductors 14 Exploded View ...
Страница 44: ......
Страница 47: ...20 2 DPC 2 ...
Страница 48: ......