secondary latch switch.
3. Test the continuity of the switches with the door open and closed
with an ohm meter on the lowest scale.
Normal continuity readings should be as followed.
Door Open
Door Closed
Primary Latch
Switch
infinite
(Open)
0 (Close)
Secondary
Latch switch
infinite
(Open)
0 (Close)
Power relay B
infinite
(Open)
infinite
(Close)
10.2. Short Switch and Monitor Circuit
1. Unplug the lead wires from the HV inverter primary terminals.
2. Connect the test probes of the ohm meter to these leads
3. Test the continuity of the short switch with the door open and the
door closed using the lowest ohm scale.
Door Open
Door Closed
Monitor switch
0
infinte
10.3. Magnetron
Continuity checks can only indicate an open filament or a shorted magnetron. To diagnose an
open filament or shorted magnetron.
1. Isolate the magnetron from the circuit by disconnecting the HV
leads
2. A continuity check across the magnetron filament terminals
should indicate one ohm or less
3. A continuity check between each filament terminal and the
magnetron case should read open.
31
Содержание NN-A850CB
Страница 4: ...3 Control Panel 4 Operation And Digital Programmer Circuit Test Procdure 4 ...
Страница 5: ...5 ...
Страница 6: ...6 ...
Страница 7: ...5 Schematic Diagram 7 ...
Страница 13: ...Convection and microwave duty cycles Figure 2 Grill and microwave duty cycles 13 ...
Страница 29: ...Removing the oven back plate Figure 15 Removing the base plate Figure 16 29 ...
Страница 36: ...Fuses are not blown Fuses are not blown 36 ...
Страница 37: ...Other problems Inverter circuit troubleshooting 37 ...
Страница 38: ...Alternative method for toubleshooting the inverter circuit 13 Digital Programmer Troubleshooting Guide 38 ...
Страница 39: ...How to check semiconductors 14 Exploded View 39 ...
Страница 45: ...45 ...
Страница 48: ...48 ...
Страница 49: ...22 Key Board Matrix 49 ...
Страница 50: ...23 Digital Programmer Circuit Parts 23 1 E603L4V20BP E603L4V30BP DPCAU 50 ...