Caution
1. High voltage is present at the high voltage terminal of the inverter
unit, including the aluminium heat sink.
2. It is not necessary or advisable to attempt to measure this high
voltage.
3. Before touching any oven components, or wiring, always unplug
the oven from its power source and discharge the high voltage
capacitors.
10.1. Primary Latch Switch, Secondary Latch Switch and power relay
B interlocks.
1. Unplug the lead connectors to power relay B and verify the
continuity of the power relay B 1-2 terminals.
2. Unplug the lead connectors to the primary latch switch and
secondary latch switch.
3. Test the continuity of the switches with the door open and closed
with an ohm meter on the lowest scale.
Normal continuity readings should be as followed.
Door Open
Door Closed
Primary Latch
Switch
infinite
(Open)
0 (Close)
Secondary
Latch switch
infinite
(Open)
0 (Close)
Power relay B
infinite
(Open)
infinite
(Close)
10.2. Short Switch and Monitor Circuit
1. Unplug the lead wires from the HV inverter primary terminals.
2. Connect the test probes of the ohm meter to these leads
3. Test the continuity of the short switch with the door open and the
door closed using the lowest ohm scale.
Door Open
Door Closed
Monitor switch
0
infinte
10.3. Magnetron
37
Содержание NN-A750WB
Страница 16: ...16 ...
Страница 17: ...6 Wiring Diagram 17 ...
Страница 23: ...Convection And Microwave Duty Cycles Figure 2 Grill and Microwave Duty Cycles Figure 3 23 ...
Страница 45: ...Figure 2 How to test the semiconductors 14 Main Parts List 45 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...16 Door Assembly 51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 55: ...55 ...
Страница 56: ...56 ...
Страница 58: ...58 ...
Страница 61: ...DPC Schematic 1 61 ...
Страница 62: ...62 ...
Страница 63: ...DPC Schematic 2 22 Key Board Matrix 23 Digital programmer circuit parts list 23 1 E603L4L00BP DPC AU 63 ...