22
10 Measurements and Adjustments
10.1. Measurements and adjustments
10.1.1. Installation of Safety switch A,
Safety switch B and Short switch
1. When mounting Safety switch A, Safety switch B and
short switch to door hook assembly, mount the Safety
switch A, Safety switch B and the short switch to the door
hook assembly as shown. (in Figure).
NOTE: No specific adjustment during installation of
Safety switch A, Safety switch B and short switch to
the door hook is necessary.
2. When mounting the door hook assembly to the oven
assembly, adjust the door hook assembly by moving it in
the direction of arrow in (Figure) so that the oven door will
not have any play in it. Check for play in the door by pull-
ing the door assembly. Make sure that the latch keys
move smoothly after adjustment it completed. Completely
tighten the screws holding the door hook assembly to the
oven assembly.
3. Reconnect the short switch, safety switches A & B and
check the continuity of the monitor circuit and all latch
switches again.
10.1.2. Measurement of microwave output
The power output of the magnetron can be determined by per-
forming IEC standard test procedures. However, due to the
complexity of IEC test procedures, it is recommended to test
the magnetron using the simple method outlined below.
Necessary Equipment:
*1 liter beaker
*Glass thermometer (Celsius scale)
*Wrist watch or stopwatch
NOTE: Check the line voltage under load. Low voltage will
lower the magnetron output. Take the temperature read-
ings and heating time as accurately as possible.
1. Fill the beaker with exactly one liter of tap water. Stir the
water using the thermometer and record the beaker's
temperature (recorded as T1)
2. Place the beaker on the center of ceramic shelf.
3. Set the oven to High power and heat it for exactly one
minute.
4. Stir the water again and read the temperature of the bea-
ker (recorded as T2). The normal temperature rise (T2-
T1) at High power output for each model is as shown in
table.
Содержание NE-1252
Страница 2: ...2 1 Safety Precautions ...
Страница 5: ...5 4 Location of Controls and Components 4 1 Outline diagram ...
Страница 16: ...16 8 2 Troubleshooting guide ...
Страница 24: ...24 ...
Страница 25: ...25 11 Schematic Diagram 11 1 NE 12521 NE 12523 ...
Страница 26: ...26 11 2 NE 1252 ...
Страница 27: ...27 11 3 NE 17521 NE 17523 NE 17723 NE 21521 NE 21523 ...
Страница 28: ...28 11 4 NE 1752 NE 1772 NE 2152 ...
Страница 29: ...29 12 Exploded View and Replacement Parts List 12 1 Exploded view and parts list ...