29
5. Remove the circulation pump.
6. Remove the connector that is connected to the circulation
pump.
10.18. Tub Bellows Seal
1. Remove the tub gasket clip by using small screwdriver.
2. Hold the tub bellows seal and gasket-body fixing spring
together, and pull them up.
10.19. Transport Screw
1. Remove four transport screws. (box wrench size 10 mm)
2. Hold the transport screw and pull it out.
Содержание NA-127VB3WDA
Страница 3: ...3 1 Safety Precautions ...
Страница 6: ...6 4 Location of Controls and Components ...
Страница 13: ...13 ...