background image

15

6 Exploded View and Replacement Parts List

6.1.

EXPLODED VIEW (ATTACHMENTS)

)!

)%

)$

)'

)!

)

)!

)"

)&

)

)

)

)&

)%

)$

)#

)'

)

)"

)#

Содержание MC-CG677-SA76

Страница 1: ...parate the upper and lower body units 7 4 3 Printed circuit board assembly P C B Ass y removal 7 4 4 Motor removal 9 4 5 Replacement of the indicator ornamental plate unit 9 4 6 Replacement of the P C B DU P C B KU and indicator unit 10 4 7 Cord reel partition unit replacement 11 4 8 Rail base U replacement 11 4 9 Spring loaded cord reel pre winding 12 4 10 How to disassemble the turbine nozzle 12...

Страница 2: ...r source AC230V 50Hz AC230 240V 50Hz Input power MAX 1400W Input power Nominal 1200W 1100 1200W Power control O Extension wand Metal telescopic Turbin nozzle O Dimensions WxLxH mm 280x430x260 Net weight 5 1kg Cleaning tools Crevice nozzle Dusting brush ...

Страница 3: ...3 2 Location of Controls and Components ...

Страница 4: ...4 ...

Страница 5: ... problem replace the P C B Ass y P C B Ass y Check the internal parts for any thing unusual burn out melt down etc If anything unusual is found replace the P C B Ass y with new one Motor runs but there is no suction Hose or Suction inlet Check if there is any blockage in the hose or suction inlet If there is any blockage remove it Dust bag Secondary filter Check if dust bag is full or Second ary f...

Страница 6: ...ove the lead wire cover 2 When removing the lead wire cover use a flat blade screwdriver as an aid 3 Remove the connectors from the lead wire AU and P C B DU 4 Open the dust box lid assy at an angle of approximately 45 degrees and insert an flat blade screwdriver into a gap between the upper body and the dust box lid assy Move the screwdriver in the direction of the arrow to remove the left fittin...

Страница 7: ...per body U and lower body U 2 Remove the screw fixing the upper body U from the rear side 3 Lift the upper body U to separate it from the lower body U 4 3 Printed circuit board assembly P C B Ass y removal 1 Remove the Swivel cap unit 2 Remove the Insulation plate 3 Wiring illustration ...

Страница 8: ...breaking 5 Remove the fastening terminal of the lead wire from cord reel partition U connected to the printed circuit board and that of the lead wire from the motor Note When removing the fastening terminal of the lead wire please hold the terminal fixed to the printed circuit board to prevent an excessive load from being applied to it 6 Remove the Control and Lead wiire BU 7 Remove the two screws...

Страница 9: ...ted to the motor e Remove the noise suppressor f Remove the motor support rubber front Note When the thermal protector has been replaced make sure to paste the tape gasket V back on the terminals 4 5 Replacement of the indicator ornamental plate unit 1 Remove the three screws fixing the air inlet guide on the rear of the dust box lid assy 2 Hook off the two fixing tabs on the indicator ornamental ...

Страница 10: ... Replacement of the P C B DU P C B KU and indicator unit 1 Remove air inlet packing A 2 Remove the indicator unit 3 Remove the P C B KU 4 Remove the air inlet guide U and then remove the lead wire AU from the P C B DU 5 Remove the P C B DU from the air inlet guide tabs ...

Страница 11: ...el and the lower body with a screwdriver While removing the cord reel shaft from the side of the lower body lift the cord reel partition unit For easy removal pull out the cord slightly and then lift the cord reel 4 8 Rail base U replacement 1 Remove the screw fixing the rail base U onto the cord reel partition U 2 Remove the rail base U from the cord reel partition U ...

Страница 12: ...rd reel PartitionU for UK If you want to release the pre winding then make sure to hold the cord plug 4 10 How to disassemble the turbine nozzle 4 10 1 Agitator ass y 1 Rotate the Lock on the brush cover to unlock and remove the brush cover U 2 Pull up the agitator ass y and remove the belt and agitator ass y complete Fig 29 4 10 2 Separation of the floor nozzle upper U from the floor nozzle lower...

Страница 13: ...0 4 Removal of the floor nozzle brush CU DU EU FU 1 Turn the floor nozzle lower unit over Insert the tip of a flat blade screwdriver into the ditch in the brush installa tion part then remove the brush Fig 32 ...

Страница 14: ...14 5 Wiring Connection Diagram MODEL MC CG677 CG677K ...

Страница 15: ...15 6 Exploded View and Replacement Parts List 6 1 EXPLODED VIEW ATTACHMENTS ...

Страница 16: ...E DUSTING BRUSH 1 A6 AMC98R ZF00E FLOOR NOZZLE UPPER UNIT 1 A7 AMC18R ZF02E NOZZLE LEVER 1 A8 AMC78Z ZF0VE SUPPORTER 1 A9 AMC92S ZF00E AGITATOR ASSY 1 A10 AMC28S ZF00E BELT 1 A11 AMC94R ZF00E NOZZLE WAND UNIT 1 A12 AMC93S ZF00E TURBINE ASSY 1 A13 AMC13R ZF02E NOZZLE SENTER 1 A14 AMC97R ZF0VE FLOOR NOZZLE LOWER UNIT 1 A15 AMC1CR ZF00E FLOOR NOZZLE BRUSH D UNIT 1 A16 AMC1BR ZF00E FLOOR NOZZLE BRUSH ...

Страница 17: ...17 6 3 EXPLODED VIEW BODY UNIT ...

Страница 18: ...COVER 1 B33 AMV59V 4K00E P C B HOLDER 1 B34 AMC03F YD00E MOTOR SUPPORT RUBBER REAR 1 B35 XTT4 10FFJ TAPPING SCREW 2 B36 AMV07F 4K00E MOTOR SUPPORT FRONT 1 B37 AMV35G 4K00E BLACK LEAD WIRE S 1 B38 AMV20W 4K00E THERMAL PROTECTOR 1 B39 XTN3 12BFY TAPPING SCREW 2 B40 AMC99G 2800E NOISE SUPPRESSOR 1 B41 AMV92F 4K00C FAN MOTOR UNIT 1 Only UK B41 AMV92F 4K00E FAN MOTOR UNIT 1 Europe UK is excluded B42 AM...

Страница 19: ...19 6 5 PACKING INSTRUCTIONS ...

Страница 20: ...ON Q TY Remarks C1 AMV61Z 4K0SE CARTON BOX 1 C2 AMC49Z YD00E PARTITION BOARD A 1 C3 AMC69Z YD00E CUSHION A 1 C4 AMC10Z YD00E BODY BAG 1 C5 AMV01Z 4K008 OPERATING INSTRUCTIONS 1 MC CG677K Only UK C5 AMV01Z 4K00E OPERATING INSTRUCTIONS 1 MC CG677 Europe Switzerland ...

Отзывы: