4
Installations and connections
Installing the thermal recording
papar
2
Install the recording paper.
1
Open the control panel.
Control panel
開
く
Rolling core is upside
Reverse
Slack
Approx.
10cm
Click
Pull up
here.
1
Open the control
panel until it locks.
2
3
Pull the paper approx. 10 cm out of the unit and
close the control panel until it locks.
4
Pull the recording paper towards you to cut off.
Install a new thermal recording paper.
・
As of June 2003.
・
Tax not included.
●
Approximetely 5 cm of the recording paper will
come out automatically.
Replacement thermal recording paper:
UG-0010A4
(15 m role type)
¥
450