13
Ref. No. 1C
Procedure 1A
1B
1C
Removal of housing.
1. Remove nine housing screws.
2. Then open the housing A and B.
NOTE:
When opening the housings, make sure that the main PCB is on the
housing A.
If the main PCB sticks in the housing B and pull it out from the hous-
ing A, the ribbon cable may be defected.
NOTE:
The housing A and B is tightened as themotor mounting base is joint
fitting.
Hold the housing B and take it out vertically.
Ref. No. 1D
Procedure 1A
1B
1C
1D
Removal of ribbon cable.
1. Slightly lift up the connector.
NOTE:
Do not pull the connector firmly because it is not able to take out
completely.
2. Take out the ribbon cable.
Содержание EYFLA5A
Страница 3: ...3 3 Troubleshooting Guide ...
Страница 4: ...4 ...
Страница 5: ...5 ...
Страница 6: ...6 4 Service Fixture and Adjustment 4 1 Check Parts Identify Procedure ...
Страница 7: ...7 ...
Страница 8: ...8 ...
Страница 21: ...21 7 Wiring Connection Diagram ...
Страница 22: ...22 8 Schematic Diagram ...
Страница 23: ...23 9 Exploded View and Replacement Parts List 9 1 EXPLODED VIEW for EYFLA4A ...
Страница 25: ...25 9 3 EXPLODED VIEW for EYFLA5A ...
Страница 27: ...27 9 5 EXPLODED VIEW for EYFLA5Q ...
Страница 29: ...29 9 7 EXPLODED VIEW for EYFLA5B mmp ...
Страница 31: ...31 9 9 EXPLODED VIEW for EYFLA6J ...
Страница 33: ...33 9 11 EXPLODED VIEW for EYFLA6B ...