9
Ref. No. 2C
Procedure 1A
→
2A
→
2B
→
2C
Removal of Battery terminal block.
1. Take out the connector from the battery terminal block with a
screw driver.
Ref. No. 2D
Procedure 1A
→
2A
→
2B
→
2C
→
2D
Removal and assembly of motor assembly.
(Removal)
1. Unsolder to take out the lead wires.
(Assembly)
1. Use the isolation type of soldering iron (less than 80W).
2. Solder within 3 seconds with less than 400
°
C.
NOTE:
lead-free solder (Sn-3Ag-0.5Cu).
Содержание EY7420
Страница 3: ...3 3 Troubleshooting Guide Refer to Wiring Connection Diagram ...
Страница 4: ...4 ...
Страница 5: ...5 ...
Страница 12: ...12 Ref No 2H Procedure 1A 2A 2B 2C 2D 2E 2F 2G 2H Check point on wiring ...
Страница 13: ...13 Ref No 2I Procedure 1A 2A 2B 2C 2D 2E 2F 2G 2H 2I Check point on assembly ...
Страница 14: ...14 5 Wiring Connection Diagram 6 Schematic Diagram ...
Страница 15: ...Model No EY7420 Exploded View 7Exploded View and Replacement Parts List 15 ...