4. Take off the Hinge pin large and the Snap pin large, and take off
the Lift unit.
7.8. Removing the Reclining lift unit
1. Proceed the procedures of 7.1. Removing the Head rest, Back rest
cushion, Arm rest.
2. Proceed the procedures of 7.6. Removing the Under box.
3. Take off two Connectors (CN16, CN4) as the figure.
4. Take off the Hinge pin large and the Snap pin large, and take off
the Lift unit.
32
Содержание EP1273-U1
Страница 1: ...ORDER NO HPD0508U23C1 MASSAGE LOUNGER EP1273 U1 EP1272 U1 SPECIFICATIONS SPECIFICATIONS 1 ...
Страница 3: ...1 1 2 EP1272 3 ...
Страница 4: ...1 2 Controller 4 ...
Страница 8: ...5 ACTUAL WIRING DIAGRAM 8 ...
Страница 22: ...12 Unscrew four screws and remove the Massage gear block 22 ...
Страница 26: ...3 Unscrew eight screws 4 Cut off five Insulated ties 26 ...
Страница 28: ...2 Unscrew two screws 3 Remove the Bushing cover and pull out the Controller cord and take off the Connector 28 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 41: ...11 EXPLODED VIEW 41 ...
Страница 42: ...42 ...
Страница 43: ...43 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...12 REPLACEMENT PARTS LIST NOTES 47 ...