http://202.224.189.178/~sgml/viewing/EP1014-U1/NA/SVC/s1307000000.html
6.Lower the ottoman pipe cover and cut an insulated tie, then pull out the cord.
7.Remove two slitted pins and nuts (M8).
8.Remove six screws assembled in the ottoman bearing housing B and ottoman gear box A.
http://202.224.189.178/~sgml/viewing/EP1014-U1/NA/SVC/s1307000000.html (2 of 6) [12/6/2003 9:49:24 AM]