7.4. Loading section
1. Spread the tabs at the both sides and push out the drive
arm shaft.
2. Hook the lock lever spring on the lock lever projection part
temporarily.
3. Unlock the tab and remove the lock lever.
4. Remove the belt.
5. Unlock the tab and remove the pulley.
6. Remove the relay gear.
7. Turn the change lever in the arrow direction till it stops.
8. Hook the change lever spring on the change lever project
part temporarily.
13
DVD-S29EG / DVD-S29E / DVD-S29EB
Содержание DVD-S29EG
Страница 18: ...18 DVD S29EG DVD S29E DVD S29EB ...
Страница 23: ...23 DVD S29EG DVD S29E DVD S29EB ...
Страница 34: ...34 DVD S29EG DVD S29E DVD S29EB ...
Страница 53: ...17 EXPLODED VIEWS 17 1 CASING PARTS MECHANISM SECTION EXPLODED VIEW 53 DVD S29EG DVD S29E DVD S29EB ...
Страница 54: ...17 2 MECHANISM SECTION EXPLODED VIEW 54 DVD S29EG DVD S29E DVD S29EB ...
Страница 55: ...17 3 PACKING ACCESSORIES SECTION EXPLODED VIEW 55 DVD S29EG DVD S29E DVD S29EB ...