53
Notes for installation of Switch lever Ass’y
• The Spring
is set to the projection of chassis and first,
is fitted and
is latched into the concave firmly.
9.2.9.
Opener and Opener roller
1. Procedure 1,2 “9.2.1. Disassembling of Traverse Base
Ass’y, Drive P.C.B. and SW P.C.B.” is performed in this
section.
2. The Opener is slide in the arrow direction fully, and it has
sound and Opener is removed.
3. The Opener roller is removed while pushing Opener lever
to inside.
9.2.10.
Rail
1. Procedures 1-4 of “9.2.1. Disassembling of Traverse
Base Ass’y, Drive P.C.B. and SW P.C.B.” is performed in
this section.
2. The dotted line is extended to outside, and the Rail is
removed while pulling to the back (as well as other side).
Содержание DMR-XS380EB
Страница 2: ...2 ...
Страница 6: ...6 2 2 Precaution of Laser Diode ...
Страница 9: ...9 3 2 Service Information 3 3 Caution for DivX ...
Страница 16: ...16 4 Specifications ...
Страница 17: ...17 ...
Страница 18: ...18 5 Location of Controls and Components ...
Страница 19: ...19 ...
Страница 54: ...54 Installation for Rail Throw in the groove of Rail and Tray and slide to the fore of Tray ...
Страница 55: ...55 9 2 11 Grease ...
Страница 56: ...56 9 2 12 How to Clean the Lens of Optical Pick UP Follow the 9 2 2 Upper Base ...
Страница 59: ...59 10 1 2 Checking and Repairing of DVD Drive ...
Страница 60: ...60 10 1 3 Checking and Repairing of AV IO P C B ...
Страница 61: ...61 10 1 4 Checking and Repairing of HDD ...
Страница 62: ...62 10 1 5 Checking and Repairing of Digital P C B ...
Страница 75: ...S 11 ...
Страница 89: ...S 25 ...
Страница 104: ...S 40 ...
Страница 121: ...S 57 S8 2 Frame and Casing Section 2 50 50 3 50 4 56 5 142 143 4 50 6 50 5 50 2 57 55 145 144 4 2 50 1 ...
Страница 123: ...S 59 S8 4 Packing Parts and Accessories Section A2 A2 1 A1 A5 A7 PC1 PC4 PC3 PC2 A4 A3 BATTERY REMOTE CONT ...