Push
ELB Test
ELB Reset
Push Up
Push On-Off
Pow
er Control
Off
High
ELB
2. HOW TO INSTALL
1. Where to install the Unit.
• Be sure to install the Unit on the wall as illustrated in
Figure 1 (vertical condition only).
• Do not install the Unit away from wall surface as
shown in Figure 2.
• The Unit must be installed at 1.5 m ~ 1.7 m above
the floor.
2. How to remove the Front Plate
①
Make sure the Power Control Knob is at "OFF"
condition.
②
Remove the screw at the bottom of the Unit.
③
Lift up the Power Control Knob to make it free
(Power Control Knob is attached to "VR Shaft"
inside the Unit). Make sure the Power Control
Knob is not detached from the Front Plate.
④
Remove the Front Plate by lifting up the bottom side
and then unhook the top side.
For DH-3NP2
For DH-3NS1/DH-3NS2
Figure 1
Figure 2
During installation process make sure electric
and water supply is turn "OFF".
WARNING
1.5 m ~
1.7 m
Main Pipe Rising Level
* Maximum total length
of feeding pipe should
be below 10 m.
* The feeding pipe
should be 1/2 inch.
33 ft (10 meters)
maximum recommended
height between bottom
of cold water tank and
top of shower Units.
Cold Water
Tank
Service
Valve
1.5 m ~
1.7 m
Note
Power Control Knob attached to Front Plate.
Power Control
Knob
Power Control Knob
Screw
Front Plate
Lift up
Powe
r Control
Off
High
ELB
ELB Test
ELB Reset
Push Up
DH-3NS1
Push On-Off
Pow
er Control
Off
High
ELB
Push
ELB Test
ELB Reset
Push Up
DH-3NS1
Push On-Off
Powe
r Control
Off
High
ELB
④
②
Note: When removing the Unit from package, some water may be found inside.
This is normal as the Unit is tested during the manufacturing process.
(1) Make sure water flow pressure.
Min. water pressure
9.8 kPa / 0.1 k
g
f/cm² / 1.42 psi (DH-3NS1 & DH-3NS2)
Min. water pressure
4.9 kPa / 0.05 kgf/cm² / 0.71 psi (DH-3NP2)
Max. water pressure
380 kPa / 3.87 kgf/cm² / 55 psi
• How to measure the water pressure as illustrated. Water should flow out of the
Hose 2.0 m above the Main Water Valve.
2.0 m
1. BEFORE INSTALLATION
HOW TO INSTALL ELECTRIC HOME SHOWER
• Flexible Cord must enter the Unit thru designated point only (do not make additional holes).
• Proper size of Flexible Cord and electric wiring must be installed to avoid smoke emission and fire hazards.
• During installation process make sure electric and water supply are turned "OFF".
• The home shower must be permanently connected to the electric supply through the ON/OFF DP (double
pole) Switch having a contact separation of at least 3 mm in all poles incorporated in the fixed wiring. This
switch must be clearly identifiable but out of reach of a person using a fixed bath or shower.
The Unit must be earthed.
Improper grounding could cause electric shock.
• Never install Filter Body Assembly at the outlet, inlet water cannot be filtered and allows
foreign particles to enter the Unit. It will cause Heater Unit and Shower Head to clog up.
• Do not install, remove and reinstall the Unit by yourself.
Improper installation will cause leakage, electric shock or fire. Installation and wiring must be
done by competent personnel.
• Do not share the inlet and outlet pipe of the Home Shower Unit with other outlets.
The pressure may drop due to water being drawn off at other point. The shower temperature
may become very hot.
WARNING
CAUTION
Push
Water Inlet
Water Outlet
Water
Volume
Knob
ELB Test
ELB Reset
Push Up
DH-3NS1
Push On-Off
Pow
er Control
Off
High
ELB
ENGLISH
INST
ALLA
TION
- 25 -