Section 300-Installation
Chapter 3. Cabinet Installation
DBS-2.3/9.2-300
DBS Manual - Revised April 2000
3-17
System Initialization
1. Confirm that the DBS power switch is
OFF
.
2. Plug the power cord into a dedicated 120V 15 amp AC wall outlet.
Note:
A surge protector should be installed on the power cord.
3. Set SW1 on the CPC card to RAMCLR (RAM Clear).
Figure 3-17. CPC memory clear switch
4. Turn the power switch on.
As the system loads, the bottom LED lamp on the CPC card will flash.
5. Once the bottom LED lamp on the CPC card stops flashing, set SW1 on
the CPC to RAMHOLD.
R A M H O LD
TRK1
TRK2
TRK3
EC1
EC2
EC3
EC4
EC5
EC6
EC7
EC8 EC/TRK SCC
CPC
AUX1
AUX2
STATU S
LED
SW 1
R A M C LR
Содержание DBS 40
Страница 12: ...About This Manual Section 300 Installation xii DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 18: ...Chapter 1 Requirements Section 300 Installation 1 6 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 20: ...2 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 28: ...Chapter 2 System Overview Section 300 Installation 2 10 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 30: ...3 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 48: ...Chapter 3 Cabinet Installation Section 300 Installation 3 20 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 50: ...4 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 94: ......
Страница 96: ...5 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 132: ...6 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 144: ...7 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 160: ...Chapter 7 Specifications Section 300 Installation 7 18 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Страница 204: ...Index Section 300 Installation Index 8 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...