23
(EN)
Indoor unit test operation
Performing/Finishing test operation
1
Select All, Zone or Group.
Indicator
lights up.
Press
. Press
.
Press [All]
[Zone]
[Group]
, and go to ALL.
All
2
Operate with All.
Press
.
3
Perform test operation.
Press
.
4
Finish the test operation.
According to the test operation ON/
OFF procedure, set OFF.
Zone
2
Select the zone from zone 1 to 4 to
operate.
▲ ▼ →
3
Perform test operation.
Press
.
Displays
the selected
zone.
4
Finish the test operation.
According to the test operation ON/
OFF procedure, set OFF.
ENGLISH
業務用リモコン̲CZ-64ESMC3据付書̲En.indd 23
業務用リモコン̲CZ-64ESMC3据付書̲En.indd 23
2016/03/09 19:53:08
2016/03/09 19:53:08