11
Features
and
Installation
9
5
5
5
(Type A)
(Type A)
11
Shipping
Screws
1
2
3
4
8
11
12
9
7
6
5
10
Lower guide
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling while bracing the
cabinet.
3. Cut the window sash seal to the proper
length.
Peel off the backing and attach the FOAM-PE
to the underside of the window sash.
4. Remove the backing from the top upper guide
FOAM-PE
and attach it to the bottom of
the upper guide
5. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
6. Insert the Frame Curtain
into the upper
guide.
7. Fasten the curtains to the unit with 4 Type
A screws.
Suggested Tool Requirements
■
Top retainer bar
is in the product
package.
Installation Kits Contents
SCREW, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
SCREW(TYPE A) (10mm (25/64"))
16
6
SCREW(TYPE B)
3
7
SCREW(TYPE C)
5
8
FOAM-STRIP
1
9
FOAM-PE (600mm x 25mm x 2mm)
1
10
WINDOW LOCKING BRACKET
1
11
FOAM-PE (920mm x 30mm x 2mm)
1
12
DRAIN PIPE
1
D5.1mm (3/16")/16mm (5/8")
D4.1mm (5/32")/16mm (5/8")
Содержание CW-XC104HK
Страница 17: ...17 Memo ...
Страница 33: ...33 Nota ...
Страница 49: ...49 MEMO ...
Страница 50: ...50 MEMO ...
Страница 51: ...51 MEMO ...
Страница 54: ...54 Ref Acwar 11 03 ...
Страница 55: ...55 Ref AcwarFr 11 03 ...