
Outdoor Unit
• To protect compressor from reverse
rotation when there is a instantaneous
power failure.
60 Secs. Forced Operation Control
• Once the compressor is activated, it
does not stop within the first 60 secs.
However, it stops immediately with
remote control stop signal.
Overload Protector
• 2-Stage OLP to protect the compressor.
Overload Protector will trip when
– Temperature of compressor increases
to 120°C.
– High temperature or high current flows
to compressor.
(Refer circuit diagram for OLP
characteristic)
Compressor Reverse Rotation
Protection Control
Outdoor Fan Operation Control
• Inner protector.
4-Way Valve Control
• When the unit is switched to “OFF”
during Heating Operation, 4-way valve
stays at Heating position for 5 minutes.
Overload Protection Control
• Outdoor fan stops when indoor heat
exchanger temperature rises to 51°C
and above, and restarts when the indoor
heat exchanger temperature drops to
49°C and below.
• Compressor stop when indoor heat
exchanger temperature reaches 65°C or
above. (Heating Operation Only)
Deice Control
• To prevent frosting at outdoor heat
exchanger. (Only for Heating Operation)
• Temperature of outdoor heat exchanger
is sensed by TRS (Thermal Reed Switch).
TRS OFF temperature 4°C.
TRS ON temperature -3°C.
Compressor Protection Control
• If the outdoor fan motor is not running
after compressor starts for 50 secs.,
compressor will stop. (Cooling and Soft
Dry Operation only).
CU-MA185KE / CU-MA195KE / CU-MA245KE
5
CS-MA95KE CU-MA185KE / CS-MA125KE CU-MA245KE / CS-MA75KE / CS-MA125KE CU-MA195KE
Содержание CS-MA95KE
Страница 12: ...4 Dimensions 12 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 13: ...13 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 14: ...5 Refrigeration Cycle Diagram 14 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 15: ...6 Block Diagram 15 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 20: ...Cooling Operation Time Diagram 20 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 22: ...Soft Dry Operation Time Diagram 22 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 79: ...14 Technical Data 79 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 81: ...81 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 82: ...82 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 83: ...83 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 94: ...94 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...
Страница 96: ...22 1 REMOTE CONTROL 96 CS MA95KE CU MA185KE CS MA125KE CU MA245KE CS MA75KE CS MA125KE CU MA195KE...