31
9.3. Reassenbly instructions
9.3.1. Attention when CF-T5L series is repaired
- Please execute writing BIOS ID when you exchange the main board.
- Parts (sheet and rubber) etc.related various the conductive cloth and heat spreader cannot be recycled.Use
new parts.
9.3.2. Assembly knowhow of the LCD
9.3.2.1. Assembly of the LCD Front
5mm
5mm
5mm
Table (reception desk cabinet side) respect
FRONT TP CUSHION A
FRONT TP CUSHION B
TOUCHPANEL
TOUCHPANEL
FRONT TP CUSHION C
FRONT TP CUSHION D
FRONT TP CUSHION D
FRONT TP CUSHION D
FRONT TP CUSHION D
FRONT TP CUSHION D
FRONT TP CUSHION D
Back (LCD side) respect
The glass
switching off
lack part
The glass
switching off
lack part
In a two sided tape, long one is a
Flexible cable side.
Affixation of LCD Front TP CUSHION/A/B/C/Tape
9.3.2.2. Putting Front TP Cushion
Does not run aground
in a surrounding rib.
Does not run aground
in a surrounding rib.
-LCD Batt Rubber does not overlap.
-Does not run aground in a surrounding rib.
draw on
draw to the under
Space between LCD
Batt Rubber
LCD Side Rubber
LCD Batt Rubber
LCD Batt Rubber
LCD Front WAN
Affixes between ribs.
Paste side
LCD Magnet
When affixing, the tool is used.
Puts in the length wall.
-LCD Side Rubber, LCD Batt Rubber and LCD Magnet are not put out from the concave part.
-It is noted that the finger does not touch the paste side when there are put.
Содержание CF-T5LWETZ1
Страница 2: ...2 ...
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 6: ......
Страница 7: ......
Страница 10: ...10 3 Block Diagram ...
Страница 11: ...11 4 Diagnosis Procedure 4 1 Basic Procedures ...