ELECTRICAL ADJUSTMENT
CONTENTS
Preparation for Adjustment ................................ ELE-1
Connection of the Tool.................................... ELE-1
Function Explanation(Ver. 3.2) ....................... ELE-1
EVR DIRECT FUNCTIONS............................ ELE-1
1. Power ............................................................. ELE-2
1-1. 3.0V Adjustment ..................................... ELE-2
1-2. 5.0V Adjustment ..................................... ELE-2
1-3. 3.6V Adjustment ..................................... ELE-2
1-4. 17.5V Adjustment ................................... ELE-2
1-5. -10.8V Confirmation ............................... ELE-2
1-6. -3.8V Confirmation ................................. ELE-2
1-7. -5.6V Adjustment.................................... ELE-3
1-8. 5.6V Adjustment ..................................... ELE-3
1-9. 9.0V Adjustment ..................................... ELE-3
2. CAMERA........................................................ ELE-4
2-1. Initial Setting........................................... ELE-4
2-2. SUB Voltage Initial Adjustment .............. ELE-4
2-3. OG Voltage Adjustment.......................... ELE-4
2-4. R-DC Voltage Adjustment ...................... ELE-4
2-5. SMPL Pulse Adjustment ........................ ELE-5
2-6. CLMP Pulse Adjustment ........................ ELE-5
2-7. Blooming Adjustment ............................. ELE-6
2-8. Carrier Reduce Adjustment.................... ELE-6
2-9. RGB SH Level Adjustment..................... ELE-7
2-10.RGB SH DC Adjustment ........................ ELE-7
2-11.Saturation Noise Confirmation ............... ELE-8
2-12.Double Lighting Level Adjustment.......... ELE-8
2-13.RGB BLK Adjustment............................. ELE-9
2-14.RGB A/D INPUT Level Adjustment ........ ELE-9
2-15.RGB PED Adjustment ............................ ELE-9
2-16.PED Balance Adjustment....................... ELE-10
2-17.AWB Operation Confirmation ................. ELE-10
2-18.ABB Operation Confirmation.................. ELE-10
2-19.High Contrast Object Confirmation ........ ELE-10
3. DSP / ENCODER........................................... ELE-11
3-1. Initial Setting........................................... ELE-11
3-2. AD REF Voltage Confirmation................ ELE-11
3-3. Y Level Adjustment ................................ ELE-12
3-4. SYNC Level Adjustment......................... ELE-12
3-5. PR Level Adjustment.............................. ELE-13
3-6. PB Level Adjustment.............................. ELE-13
3-7. Setup Level Setting ................................ ELE-14
3-8. Carrier Balance Adjustment ................... ELE-15
3-9. Camera ENC Level Adjustment ............. ELE-15
3-10.Camera SYNC Level Adjustment........... ELE-16
3-11.Camera Vector Adjustment .................... ELE-16
3-12.Burst Level Adjustment .......................... ELE-17
3-13.Monitor OUT Level Adjustment .............. ELE-17
3-14.Monitor SYNC Level Adjustment............ ELE-18
3-15.Character Level Adjustment................... ELE-18
3-16.VIDEO IN Level Adjustment................... ELE-19
3-17.MON ENC Level Adjustment.................. ELE-19
3-18.PLAYBACK Level Adjustment................ ELE-20
4. SYNC ............................................................. ELE-21
4-1. Setting Method ....................................... ELE-21
4-2. 4fsc VCO Adjustment............................. ELE-21
4-3. 27MHz CLOCK Adjustment ................... ELE-21
4-4. SCH PHASE Adjustment ....................... ELE-22
4-5. SYSTEM PHASE Adjustment (1)........... ELE-22
4-6. SYSTEM PHASE Adjustment (2)........... ELE-23
4-7. SYSTEM PHASE Adjustment (3)........... ELE-24
4-8. REF SCH Adjustment ............................ ELE-24
5. PRE PROCESS ............................................. ELE-25
5-1. R,G,B PEDESTAL Adjustment............... ELE-25
5-2. 0 IRE ABB Confirmation......................... ELE-25
5-3. R,G,B TEST Signal Level Adjustment.... ELE-26
5-4. R,G,B AD Input Level Adjustment.......... ELE-26
5-5. R,G,B PED TRACK Adjustment............. ELE-27
5-6. PRE AMP DC Adjustment...................... ELE-27
5-7. R,G,B SH Level Adjustment................... ELE-27
5-8. Modulation Ratio Adjustment ................. ELE-28
5-9. Modulation Ratio Confirmation.............. ELE-28
5-10. Highlight Clip Adjustment...................... ELE-29
6. CAMERA SYSCON ....................................... ELE-30
6-1. White Shading Adjustment..................... ELE-30
6-2. Digital Dark Shading Adjustment ........... ELE-30
6-3. Flare Compensate Adjustment
............ ELE-31
6-4. R,B Gamma(1) Adjustment .................... ELE-32
6-5. R,B Gamma(2) Adjustment .................... ELE-33
6-6. R,B Gamma(3) Adjustment .................... ELE-34
6-7. Dynamic Range (Auto Knee)
Adjustment ............................................. ELE-35
Содержание AJ-D610WBp
Страница 3: ... 3 ...
Страница 4: ... 4 ...
Страница 5: ... 5 AJ D610WBE ...
Страница 6: ... 6 ...
Страница 7: ... 7 ...
Страница 9: ... 9 AJ D610WBP ...
Страница 10: ... 10 AJ D610WBE ...
Страница 11: ...FCD0202NCKK29WB ...
Страница 49: ...INF 37 17 Circuit board layout ...
Страница 118: ...PRE AMP CDS BLOCK DIAGRAM BLK 4 ...
Страница 133: ...SCHEMATIC DIAGRAMS NOTE BE SURE TO MAKE YOUR ORDERS OF REPLACEMENT PARTS ACCORDING TO PARTS LIST SECTION 7 ...
Страница 136: ...1 2 3 4 5 6 7 1 2 2 1 1 2 1 VJB80858 ...
Страница 268: ...BYPASS P C BOARD VEP80A69A COMPONENT SIDE COMPONENT SIDE REF LOC IC6300 A1 IC6301 B1 IC6302 B1 IC6303 C1 CBA 21 ...
Страница 271: ... FOIL SIDE COMPONENT SIDE OPERATE P C BOARD VEP86149A CBA 24 ...