Note:
In early units, a washer is used. When servicing the washer or the
P5 Arm Unit, replace only the P5 Arm Unit with a new one, and
remove the washer.
6.2.12.1. Reassembly Notes
1. Installation/Alignment of Intermediate Gear A, Lift Gear and P5
Arm Unit
A. Rotate the Lift Gear so that Hole A on Lift Gear is a Through
Hole with a hole on chassis.
B. Install the Intermediate Gear A so that the hole on Intermediate
Gear A is aligned with the hole on Lift Gear.
C. Install the P5 Arm Unit so that it contacts with the tab of
chassis.
Fig. J10-2
2. Installation of Opener Piece
A. Install the Opener Piece so that the slot of the Opener Piece is
inserted to the Pin of Pinch Arm Unit
Fig. J10-3
45
Содержание AG527DVDE - DVD/VCR/MONITOR
Страница 1: ...ORDER NO MKE0206606C1 D1 TV DVD VCR Combination AG 527DVDE SPECIFICATIONS 1 ...
Страница 28: ...Fig D2 28 ...
Страница 29: ...Fig D3 29 ...
Страница 30: ...6 1 1 1 Notes in chart 1 Removal of VCR DVD Ass y Fig D4 30 ...
Страница 34: ...6 2 3 EJECT Position Confirmation Fig J1 2 34 ...
Страница 35: ...6 2 4 Full Erase Head and Cylinder Unit Fig J2 35 ...
Страница 76: ...76 ...
Страница 79: ...11 2 MECHANISM BOTTOM SECTION 79 ...
Страница 80: ...11 3 CASSETTE UP COMPARTMENT SECTION 80 ...
Страница 81: ...11 4 CHASSIS FRAME SECTION 1 81 ...
Страница 82: ...11 5 CHASSIS FRAME SECTION 2 82 ...
Страница 83: ...11 6 CHASSIS FRAME SECTION 3 83 ...
Страница 84: ...11 7 PACKING PARTS AND ACCESSORIES SECTION 84 ...
Страница 101: ...C3038 ECEA1CKA100 ELECTROLYTIC 16V 10UF 101 ...