Operation manual for Narrow-pitch connectors A4S
Panasonic Corporation
industrial.panasonic.com/ac/e/
©
Panasonic Corporation 2015
ACCTF6E-2 201506
- 25 -
(3)
Precautions for not making defects during inspection process
①
At the start of every operation, check if any abnormal conditions exist in the
contact or molded part of the inspection-side connector before starting the
inspection operation.
②
For ensuring a long service life, periodically apply an ion blow and air blow to
remove foreign objects from the connector cavities.
③
When forced fitting is repeated under misaligned condition, the socket contact
may buckle or become deformed.
Persistence of this condition will push the product-side header post and deform
it. Because this deformation may cause a contact failure, the socket must be
replaced immediately.
This condition may indicate a normal contact result during inspection but will
cause a contact failure when assembled into a product.
④
Immediately replace the faulty product as soon as it is found.
Verify all units of the same inspected lot again to confirm that they are normal.