Panamax SM3-PRO Скачать руководство пользователя страница 3

Congratulations for purchasing the Panamax SM3-PRO Power Management with remote, cloud based control and monitoring. The SM3-PRO features 
Panamax’s revolutionary AVM (Automatic Voltage Monitoring) circuit, and our exclusive Linear Filtering Technology (LiFT). Together, these technologies 
comprise precisely what our customers have come to expect from Panamax: uncompromised AC protection and purification.  
Outlets: Rear panel outlets are controlled in two power filtered banks. They are grouped into two (2) switched banks.  BlueBOLT® is included, providing 
secure, hosted IP system control and monitoring for the SM3-PRO.

Introduction

BANK 1

ETHERNET 1

SM3-PRO SYSTEM MANAGER

ETHERNET 2

BANK 2

UNSAFE

VOLTAGE

WIRING

FAULT

BlueBOLT

ACC 1

ACC 2

RESET

Feature Descriptions......................................................................................................................................................................................... pg.  1
Important Safety Instructions, Front Panel Features Overview.............................................................................................................................. pg.  2
Rear Panel Features Overview, Bubble of Protection.......................................................................................................................................... pg.  3
BlueBOLT® Setup,   Registration,   Trouble   Shooting.............................................................................................................................................  pg.     4
Outlet Sequencing and SM3-PRO Specifications................................................................................................................................................... pg.     5
Diagram    to   Identify    Connected   Equipment,   Additional    Notes...............................................................................................................................pg.        6
Advanced Operation, Communication and Messaging Protocol .......................................................................................................................pgs. 7- 13

FCC   Notice,    Contacting    Customer      Service..........................................................................................................................................................   pg.     13
Limited Product Warranty and Connected Equipment Policy............................................................................................................................. pg. 14

Box should contain the following, including the Quick Start Guide:

Before You Begin Inspect Upon Receipt.

1. SM3-PRO

3. 

Universal 

Mounting 

Bracket 

Panamax, 1800 S. McDowell Blvd., Petaluma, CA 94954    •   www.panamax.com   •   800-472-5555  •  707-283-5900   •  Fax 707-283-5901 

®2015 Core Brands LLC. All rights reserved. Panamax and BlueBOLT are registered trademarks of Core Brands LLC a Nortek, Inc. company

Table of Contents

2. 

Two Ft. detachable power cord. Retntion clip 

and 2 screws included. 

Содержание SM3-PRO

Страница 1: ...PDF provided by Conference Room AV Furman SM3 PRO 15A BlueBOLT Compact Power Conditioner 3 Outlet...

Страница 2: ...SM3 PRO SYSTEM MANAGER ETHERNET 2 BANK 2 UNSAFE VOLTAGE WIRING FAULT BlueBOLT ACC 1 ACC 2 RESET Power Management with Remote Cloud based Control and Monitoring 15 Amp Capacity 3 Rear Panel Outlets in...

Страница 3: ...ture Descriptions pg 1 Important Safety Instructions Front Panel Features Overview pg 2 Rear Panel Features Overview Bubble of Protection pg 3 BlueBOLT Setup Registration Trouble Shooting pg 4 OutletS...

Страница 4: ...Protect or Disconnect Circuitry will disconnect your equipment in order to protect it The SM3 PRO will need to be repaired or replaced by Panamax if this occurs within the product s 3 year warranty S...

Страница 5: ...ACC 1 ACC 2 RESET OUTLET 1 120V 60Hz GROUND BANK 1 BANK 2 OUTLET 2 OUTLET 3 12A 1 2 3 4 5 6 Color State Status OFF The wall outlet is properly wired RED The wall outlet is reversed wired or the ground...

Страница 6: ...LAN HDMI AC LAN AC HDMI LAN Diagram 1 Diagram 2 Rear Panel Features Overview 3 ETHERNET 1 SM3 PRO SYSTEM MANAGER ETHERNET 2 UNSAFE VOLTAGE WIRING FAULT BlueBOLT ACC 1 ACC 2 OUTLET 1 120V 60Hz GROUND...

Страница 7: ...cable and confirm the unit s breaker has not been tripped Q Is your Internet connection functioning Q Can you access a general web page Q Is your SM3 PRO connected to your internet router or modem A C...

Страница 8: ...Off Delay When a Turn Off Sequence is initiated the outlet bank will turn OFF after the Turn Off Delay time The delay times are pre programmed but may be changed on the BlueBOLT web site or by issuing...

Страница 9: ...______________ LAN 2 MAC ADDRESS __ __ __ __ __ __ __ __ __ __ __ __ CHALLENGE KEY __ __ __ __ __ __ __ __ __ __ __ __ Name Location of Installation ___________________________________________ _______...

Страница 10: ...Snippet of the response to sendinfo query xml version 1 0 device class sm3 id 1065a30400 info time 1403729752 sernum 12345678 sernum fwver 1 0 1 fwver info device GENERAL All messages are encapsulated...

Страница 11: ...t Command messages with the xid attribute expressed will return an acknowledgement enclosed in an ack element For example when the message xml version 1 0 device class sm3 id 1065a3040000 command xid...

Страница 12: ...bank bank 0 outlet bank OFF 1 outlet bank ON tfilestate For Core Brands use only Query sendsettings Response settings Time stamp of the data provided in UNIX time time timestamp delay id bank Delay fo...

Страница 13: ...onds 65536 seconds max Set Settings Example command set delay id 1 act 0 10 delay Set bank 1 for 10 second turn off delay delay id 1 act 1 1 delay Set bank 1 for 1 second turn on delay delay id 1 act...

Страница 14: ...format commands eventmgr unsubscribe uri ctrlsys IPADDR PORT eventmgr commands General Event Element Structure All event messages are contained within an event element which will contain a timestamp...

Страница 15: ...ngs Event section for details Example set delay id 1 act 2 12 delay Outlet bank 1 power cycle delay 12 sec set Settings Changed A Settings Changed event is posted when the device settings such as outl...

Страница 16: ...sed in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equip...

Страница 17: ...mined that you are entitled to compensation Panamax will at its election either pay you the present fair market value of the damaged equip ment or pay for the cost of the repair or send you replacemen...

Отзывы: