Installation manual - English
The house can be installed on either a soft (for instance: lawn) or hard (for instance: pavement slabs) surface.
A. Soft surface installation
When installing the house on a soft surface, use concrete forks (4 pcs), Art. 73530 (manufactured from
structural steel S235 and reinforced steel DIN488,BST500).
NB! The concrete forks are not included in the supplied kit!
Dig a hole for each support (consult with a local construction company), fill it with concrete and place the
concrete forks in the precisely measured spots. Make sure that all the concrete forks are situated at the same
height! Allow sufficient time for the concrete to harden. After that put the house on the forks and attach with
bolts.
Содержание Toby
Страница 116: ......
Страница 120: ......
Страница 121: ......
Страница 122: ...16 22x 3 det 16 22 pcs F12 66 pcs F12 ...
Страница 123: ......
Страница 124: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ...F7 1x F7 4x F5 1x F12 17 44x 10 det 15 2 pcs det 17 44 pcs F5 2 pcs F7 10 pcs F12 88 pcs 15 15 ...
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 135: ......
Страница 136: ...80 600 F10 4x F10 2x 33 32 F11 2x Slide is optional ...
Страница 137: ......
Страница 138: ...min 2m min 2m min 2m min 2m ...