background image

Содержание PAJ28-3030-1

Страница 1: ...fettosi gi montati o verniciati sono esclusi dal diritto alla sostituzione Ogni altro diritto resta escluso In caso di reclamazione procedere nel modo seguente presentare questo certificato di control...

Страница 2: ...ers adresse Ostajan osoite K parens adress Telephone Telefoon Telefon T l phone Tel fono Telefon Telefon nr Puhelin Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabhole...

Страница 3: ...iche tecniche al prodotto Reservado el derecho a modificaciones t cnicas Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Log cabin PAJ28 3030 1 Blo...

Страница 4: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Страница 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Страница 6: ...same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pa...

Страница 7: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Страница 8: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Страница 9: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Страница 10: ...w place the pos PR2 and PR3 from the top to the purlin and from the bottom to the upper wall log Fixate the U Profile boards between the purlins and on the walls Start placing the roof boards with the...

Страница 11: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Отзывы: