Palmako FRG34-5038 Скачать руководство пользователя страница 22

Installation manual 

– English 

 

 
 

 

 

Having  installed  the  roof  boards,  the  roof  felt  and  roof 
slats must be attached.  

The  table  of  components  shows  whether  the  roof 
cover  material  and  slats  are  included  with  this 
house option! 

First of all, screw the roof edge reinforcements and eave 
edgings under the roof board ends. Then install the roof 
cover material. 

 

 

 

Installation of roof slats: 

 

Roof cover material (NB! Some house options do not include it in the kit!) 

Cut  the  roof  felt  in  accordance  with  the  roof  length  into  suitable  pieces  and  begin  installing  them 
parallel to the lower edge of the roof, moving toward the crest and placing the felt strips in the direction 
from  the  back  wall  to  the  front  wall.  The  felt  should  extend  from  the  edge  by  approximately  2-4  cm. 
Attach the roof felt to the roof boards with the supplied felt nails at intervals of about 15 cm. Make sure 
that the felt strips overlap by at least 10 cm.  

 

 

 

Having installed the roof cover material, attach the 
wind braces to the roof and the facia boards to the 
purlins and upper wall logs.  

 

Installation of wind braces and facia boards: 

 

 

Floor 

Only  when  the  house  is  built  completely  you  can  install  the  floor  boards,  thus  avoiding  unnecessary 
smudging on the floor. 

Place the floor boards on the base frame, tap them lightly against one another and then nail them with 
force to the foundation joists. If necessary, cut the last floor board to the suitable width.  

The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and 
walls. If necessary, cut the floor beadings to the suitable length.  

ATTENTION

:  Depending  on  the  climate  at  the  house  location,  the  floor  boards  can  either  swell  or 

diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In 

Содержание FRG34-5038

Страница 1: ...ompte En cas d une réclamation veuillez respecter le déroulement suivant il vous faudra présenter à votre commerçant agréé ce bulletin de contrôle avec le récépissé de l achat Ce ne sera que moyennant présentation de ces documents qu un traitement rapide et sans problème de votre réclamation sera possible Italiano Il prodotto che avete acquistato è stata prodotta secondo la norma di alta qualità I...

Страница 2: ...rodukto įsigijimo vietą turite pristatyti apžiūros pažymėjimą bei pirkimo kvitą Tik tais atvejais kai pristatomi minėti dokumentai pretenzija gali būti nagrinėjama greitai ir be komplikacijų Polski Produkt który Państwo zakupili wykonano według najwyższych norm jakości Elementy konstrukcyjne przed zapakowaniem przeszły dokładną kontrolę jakości Aby uniknąć problemów podczas samodzielnego montażu b...

Страница 3: ...dor Ostja aadress Telephone Telefoon Telefon Téléphone Teléfono Telefon Telefon nr Puhelin Telefon Telefon Tālrunis Telefonas Telefon Telefone Telefon Forwarder Pick up Others Door Verzending Zelf Afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Spedizioniere Mezzo proprio Entrega Transporte organizado transporte propio Transportør Sendes Hentes Transportør Sendes Hentes Rah...

Страница 4: ...ndre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Log cabin FRG34 5038 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Anneks Tuinhuis Width 500 x Depth 380 cm Breite Tiefe Largeur Profondeur Lunghezza Profon...

Страница 5: ...360 474 480 520 16 7m ...

Страница 6: ......

Страница 7: ...BOX ...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ...mber of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that ...

Страница 17: ... and windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer ...

Страница 18: ...e foundation so that its upper edge extends from the ground to a height of at least 5 cm At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on eve...

Страница 19: ...he corresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications...

Страница 20: ...ace the leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the wi...

Страница 21: ...ary or plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the fron...

Страница 22: ...ards with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the purlins and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary...

Страница 23: ...cessary shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the ...

Отзывы: