background image

Installation manual 

 

 
 

 

 Garden house painting and maintenance 

Wood is a natural material, growing and adapting depending on weather conditions. Large and small 
cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, 
but a result of wood growing and a peculiarity of wood as a natural material.  
 
Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for 
a while, and can be turn blue and become mouldy. To protect the wooden details of your garden 
house, you must immediately process them with a wood preservative.  
 
We recommend that you cover the floor boards in advance with a colourless wood impregnation 
agent, especially the bottom sides of the boards, to which you will no longer have access when the 
house is assembled. Only this will prevent moisture penetration. 

 

We definitely recommend that you also process the doors and windows with a wood impregnation 
agent, and do that namely both inside and outside! Otherwise the doors and windows can become 
twisted.  

After the house assembly is completed, we recommend for the conclusive finishing a weather 
protection paint that will protect wood from moisture and UV radiation.  

When painting, use high quality tools and paints, follow the paint application manual and 
manufacturer’s safety and usage instructions. Never paint a surface in strong sunlight or rainy 
weather. Consult a specialist regarding paints suitable for unprocessed softwood and follow the paint 
manufacturer’s instructions.  

Having been properly painted, your garden house’s lifetime will increase substantially. We recommend 
that you inspect the house thoroughly once every six months.  

 

2  Preparation for assembly 

 

Tools and preparation of components 

To assemble the garden house, you will need the following tools: 

 assembly aid 

 water-level 

 

knife 

 

 

ladder 

 screwdriver 

 measuring tape 

  

 

 hammer  

 

saw 

 pliers 

 drill

 

 

ADVICE:

 To avoid splinters, we recommend that you wear the corresponding protective gloves during 

the assembly process. 

www.simplylogcabins.co.uk

Содержание FRF34-3535

Страница 1: ...s sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis ce bulletin de contr le avec le r c piss de l achat Ce ne ser...

Страница 2: ...u r c piss Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Sped...

Страница 3: ...produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids...

Страница 4: ...y review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a...

Страница 5: ...pregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather...

Страница 6: ...sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cas...

Страница 7: ...ways assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Te...

Страница 8: ...u reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with th...

Страница 9: ...dewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder...

Страница 10: ...the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind brac...

Страница 11: ...o wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between...

Страница 12: ...12 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 13: ...13 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 14: ...14 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 15: ...15 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Страница 17: ...16 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 18: ...17 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 19: ...18 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 20: ...19 20 w w w s i m p l y l o g c a b i n s c o u k...

Страница 21: ...20 20 w w w s i m p l y l o g c a b i n s c o u k...

Отзывы: